Electricity Regulation Act 1999 (Public Service Obligations) Order 2002
F103[SCHEDULE 7
In this Schedule—
"small scale onshore wind project" means a small scale installation, onshore energy project, using wind turbine generation which is connected directly to the electricity network and metered independently of any other electricity generating plant at a single metering point;
“small scale installation” means -
(i) projects for electricity generation or storage from renewable energy sources with installed capacity below or equal to 1 MW,
(ii) for renewable energy communities projects, 100 % SME-owned projects and demonstration projects – projects from renewable energy sources below or equal to 6 MW installed capacity or maximum demand, and
(iii) for renewable energy communities projects and projects 100 % owned by micro or small enterprises – projects for wind generation only below or equal to 18 MW of installed capacity;
"small scale solar project" means a small scale installation, onshore energy project, using solar thermal or solar photovoltaic which is connected directly to the electricity network and metered independently of any other electricity generating plant at a single metering point.
|
(1) Ref. No. |
(2) SRESS Reference |
(3) Supplier |
(4) Electricity generator |
(5) Energy source of electricity |
(6) Capacity Accepted into SRESS (MW) |
|
1 |
SRESS1-0016 |
Flogas Enterprise Solutions Ltd. |
Meadhill Solar Ltd. |
Solar |
0.500] |
Annotations
Amendments:
F103
Inserted (17.12.2025) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2025 (S.I. No. 689 of 2025), art. 14 and sch. 5.
