Electricity Regulation Act 1999 (Public Service Obligations) Order 2002
S.I. No. 217 of 2002
ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) ORDER 2002
REVISED
Updated to 1 August 2025
This Revised Statutory Instrument is an administrative consolidation of the Electricity Regulation Act 1999 (Public Service Obligations) Order 2002. It is prepared by the Law Reform Commission in accordance with its function under the Law Reform Commission Act 1975 (3/1975) to keep the law under review and to undertake revision and consolidation of statute law.
All Acts up to and including the Statute Law Revision Act 2025 (10/2025), enacted 23 July 2025, and all statutory instruments up to and including Air Pollution Act 1987 (Solid Fuels, Moisture Content) (Amendment) Regulations 2025 (S.I. No. 389 of 2025), made 1 August 2025, were considered in the preparation of this Revised Statutory Instrument.
Disclaimer: While every care has been taken in the preparation of this Revised Act, the Law Reform Commission can assume no responsibility for and give no guarantees, undertakings or warranties concerning the accuracy, completeness or up to date nature of the information provided and does not accept any liability whatsoever arising from any errors or omissions. Please notify any errors, omissions and comments by email to
revisedacts@lawreform.ie.
S.I. No. 217 of 2002
ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) ORDER 2002
REVISED
Updated to 1 August 2025
TABLE OF CONTENTS
S.I. No. 217 of 2002
ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) ORDER 2002
REVISED
Updated to 1 August 2025
I, Mary O'Rourke, Minister for Public Enterprise, in exercise of the powers conferred on me by section 39 of the Electricity Regulation Act 1999 (No. 23 of 1999) (as amended by the European Communities (Internal Market in Electricity) Regulations 2000 (S.I. No. 445 of 2000) and the Sustainable Energy Act 2002 (No. 2 of 2002)), in consideration of general social, economic and environmental factors and following consultation with the Minister for the Environment and Local Government, and having, in accordance with section 39(10) of the Electricity Regulation Act 1999, given a draft of this Order to the Electricity Supply Board, being the person upon whom the obligations are to be imposed, hereby order as follows:
Citation
1. This Order may be cited as the Electricity Regulation Act 1999 (Public Service Obligations) Order 2002.
Interpretation
2. (1) In this Order-
“Act” means the Electricity Regulation Act 1999, as amended;
F1["AER V Notification" means the correspondence referred to in paragraph 1 of EU Commission document C(2002) 3 fin dated 15 January 2002 relating to a notification to the EU Commission (Reference No. N553/2001 – Ireland) pursuant to Article 88 of the Treaty, as modified by the letter from the Department to the EU Commission dated 20 July 2018 and the letter from the EU Commission to the Department dated 30 August 2018 relating to a notification to the EU Commission (Reference No. SA.50385 (2018/PN));]
F1["AER VI Notification" means the correspondence referred to in paragraph 1 of EU Commission document C(2002) 3 fin dated 15 January 2002 relating to a notification to the EU Commission (Reference No. N553/2001 – Ireland) pursuant to Article 88 of the Treaty and the correspondence referred to in paragraph 1 of EU Commission document C(2004) 3284 dated 19 August 2004 relating to a notification to the EU Commission (Reference No. N447/2003 – Ireland) pursuant to Article 88 of the Treaty, as modified by the letter from the Department to the EU Commission dated 20 July 2018 and the letter from the EU Commission to the Department dated 30 August 2018 relating to a notification to the EU Commission (Reference No. SA.50385 (2018/PN));]
F2["bioliquids" means liquid fuel for energy purposes other than for transport, including electricity and heating and cooling, produced from biomass;]
F3["biomass fuels" means gaseous and solid fuels produced from biomass;]
F4["CADA" means a capacity and differences agreement between the Board and a third party power producer and includes alternative arrangements prepared pursuant to that agreement and in accordance with its terms;]
“category” means a category of electricity account holders referred to in section 39(5A) and specified in Schedule 2 of the Act;
F5["CER" means the Commission for Energy Regulation;]
F6["commercial operation date" means, in respect of a particular PPA, the commercial operation date specified in the PPA concerned;]
“Commission” means the Commission for Energy Regulation (CER) established by the Act;
F7["Department" means the Department of Communications, Climate Action and Environment;]
“distribution system operator” means the holder of a licence granted under Section 14(1)(g) of the Act to discharge the functions of the distribution system operator;
“EU Commission” means the Commission of the European Communities;
F4["Generation Contracts Notification" means the correspondence referred to in paragraph 1 of EU Commission C(2003) 4488 fin dated 16 December 2003 relating to a notification to the EU Commission (Reference No. N475/2003-Ireland) pursuant to Article 87 of the Treaty and subsequent correspondence between the Irish authorities and the EU Commission in relation to that EU Commission document;]
F8[ "generator" means a person who is the holder of a licence to generate electricity under section 14(1)(a) of the Act;]
F9["levy period" means such period as the Commission may from time to time designate following public consultation; ]
F1["Notification" means the correspondence referred to at paragraphs 1 to 4 of EU Commission document C(2001) 3265 fin dated 30 October 2001 and at paragraphs 1 and 2 of EU Commission document C(2002) 5 fin dated 15 January 2002 relating to a notification to the EU Commission (Reference Nos. N6/A/2001 and N826/2001 – Ireland) pursuant to Articles 16 and 86 of the Treaty, as modified by the letter from the Department to the EU Commission dated 20 July 2018 and the letter from the EU Commission to the Department dated 30 August 2018 relating to a notification to the EU Commission (Reference No. SA.50385 (2018/PN));]
F10["payment period" means one particular public service obligations payment period;]
“PPA” means a power purchase agreement between the Board and a third party power producer;
“public service obligations levy” means the levy referred to in Article 7 of this Order;
F10["public service obligations payment" means the payment referred to in Article 7A;]
F5["REFIT 1" means the 2006 Renewable Energy Feed in Tariff (electricity generation from biomass, hydro and wind) scheme, as referred to in State Aid Decision C (2007) 4317 final reference N571/2006 Ireland;]
F5["REFIT 2" means the 2012 Renewable Energy Feed in Tariff (electricity generation from onshore wind, hydro and biomass landfill gas technologies) scheme, as referred to in State Aid Decision C(2012) 8 final reference SA. 31236 (2011/N) Ireland;]
F1["REFIT 3" means the 2012 Renewable Energy Feed in Tariff (electricity generation from biomass technologies) scheme, as referred to in State Aid Decision C(2011) 7593 final reference SA. 31861 (2011/N) Ireland;]
F1["REFIT Contracts Notification" means the correspondence referred to in paragraph 1 of EU Commission document C(2007) 4317 dated 25 September 2007 relating to a notification to the EU Commission (Reference No. N571/2006 – Ireland) pursuant to Article 88 of the Treaty, the correspondence referred to in paragraph 1 of EU Commission document C(2012) 8 final dated 12 January 2011 (sic) relating to a notification to the EU Commission (Reference No. SA.31236 (2011/N) – Ireland) pursuant to Article 108 of the Treaty, or the correspondence referred to in paragraph 1 of EU Commission document C(2011) 7593 final dated 18 October 2011 relating to a notification to the EU Commission (Reference No. SA. 31861 (2011/N) Ireland) pursuant to Article 108 of the Treaty, as each modified by the letter from the Department to the EU Commission dated 20 July 2018 and the letter from the EU Commission to the Department dated 30 August 2018 relating to a notification to the EU Commission (Reference No. SA.50385 (2018/PN));]
F11["REFIT power purchase agreement" means a power purchase agreement (entered into as a consequence of REFIT 1, REFIT 2 or REFIT 3) between a generator that has been accepted into REFIT 1, REFIT 2 or REFIT 3 and a supplier;]
F12["relevant supplier" means a supplier who has entered into a REFIT power purchase agreement or a RESS power purchase agreement, and references to a relevant supplier, where the context so requires, include a generator that is jointly or severally liable for a PSO Payment as a result of additional benefits under the terms and conditions of the relevant RESS competition;]
F13["RESS" means the Renewable Electricity Support Scheme, as referred to in State Aid Decision SA.54683 (2020/N) – Ireland, as modified by State Aid Decision SA. 105135;]
F13["RESS Contracts Notification" means the correspondence referred to in paragraph (1) of the European Commission document entitled ‘C(2020) 4795 final’ dated 20 July 2020 and at paragraph (1) of the European Commission entitled C(2023) 3963 final dated 12 June 2023 relating to a notification to that Commission (Reference no. SA.54683 (2020/N) – Ireland) pursuant to Article 108(3) of the Treaty on the Functioning of the European Union as modified by the letter from the Department of the 27 April 2023 and the letter of the Commission of the 13 June 2023 (Reference No SA.105135 – Ireland TCTF Amendment to SA.54683);]
F14["Short-Term Peaking Generation Notification" means the correspondence referred to in paragraph 1 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004 relating to a notification to the EU Commission (Reference No. N143/2004-Ireland) pursuant to Articles 86 and 87 of the Treaty;]
F5["single levy period" means one particular levy period;]
“supplier” means the holder of a licence granted under Section 14, subsection (1)(a) (b), (c) and (d), and subsection (2) of the Act and the Board, and the holder of a permit under Section 37 of the Principal Act, in respect of the supply of electricity to final customers;
“transmission system operator” means the holder of a licence under Section 14(1)(e) of the Act of 1999 to discharge the functions of the transmission system operator or the Board in its capacity as ESB National Grid, as appropriate.
(2) In this Order-
(a) a reference to an Article or Schedule is to an Article of, or Schedule to this Order, unless it is indicated that reference to some other Order is intended, and
(b) a reference to a paragraph or subparagraph is a reference to a paragraph or subparagraph of the provision in which the reference occurs, unless it is indicated that reference to some other provision is intended.
(3) (a) For the purposes of Article 8(1)(a) and Article 10(1)(a) “additional costs” includes costs incurred by the Board in complying with its obligations under Article 5(1)(a) and (b) incurred by it either before or after the making of this Order and which are not otherwise recovered.
(b) Nothing in F15[subparagraph (a)] shall entitle the Board to recover additional costs unless those costs are in accordance with the method for determination of costs provided for in the Notification and this Order.
F14[(3A) (a) For the purposes of Article 8(1)(bb) and (bc) and Article 10(1)(a) "additional costs" includes costs incurred by the Board in complying with its obligations under Article 6A or 6B incurred by it either before or after the coming into operation of this paragraph and which are not otherwise recovered.
(b) Nothing in subparagraph (a) shall entitle the Board to recover additional costs unless those costs are in accordance with the method for determination of costs provided for in the Short-Term Peaking Generation Notification and this Order.]
F4[(3B) (a) For the purposes of Article 8(1) (bd) and Article 10(1)(a) "additional costs" includes costs incurred by the Board in complying with its obligations under Article 6C either before or after the coming into operation of this paragraph and which are not otherwise recovered.
(b) nothing in subparagraph (a) shall entitle the Board to recover additional costs unless those costs are in accordance with the method for determination of costs provided for in the Generation Contracts Notification and this Order.]
F11[(3C) (a) For the purposes of Article 8(1)(be) and Article 10(1)(a) "additional costs" includes costs incurred by a supplier in complying with its obligations under Article 6D either before or after the coming into operation of this paragraph and which are not otherwise recovered.
(b) Nothing in subparagraph (a) shall entitle a supplier to recover additional costs unless those costs are in accordance with the method for determination of costs provided for in the REFIT Contracts Notification, as applied by CER in any relevant decision on the calculation of REFIT costs and this Order.]
F16[(3D) (a) For the purposes of Articles 8(1)(bf) and 10(1)(a), "additional costs" includes costs incurred by a supplier in complying with its obligations under Article 6E either before or after the coming into operation of this paragraph and which are not otherwise recovered.
(b) Nothing in subparagraph (a) shall entitle a supplier to recover additional costs unless those costs are in accordance with the method for determination of costs provided for in the RESS Contracts Notification, as applied by the Commission in any relevant decision on the calculation of RESS costs, and this Order.]
(4) In respect of the first levy period, a reference in Article 8(1) to administrative expenses of suppliers, the distribution system operator or the transmission system operator in the period concerned shall be construed as including administrative expenses which were incurred prior to the first levy period which relate to the introduction and implementation of the PSO Levy.
F6[(5) In respect of the first levy period, the estimation of the PSO Levy shall include an amount in respect of the additional costs of the Board in complying with the obligation to be imposed by Article 6(1A) prior to the first levy period.]
Annotations
Amendments:
F1
Substituted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(b).
F2
Inserted (23.10.2014) by European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), art. 24(1)(a).
F3
Inserted (15.07.2022) by European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), art. 16(a), in effect as per art. 1(2).
F4
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), art. 3(1)(a), (b), (2).
F5
Inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(a)(i).
F6
Inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 3(a)(ii), (b).
F7
Inserted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(a).
F8
Inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 3(1)(a).
F9
Substituted (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(a).
F10
Inserted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 3(b).
F11
Substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(a)(ii), (b).
F12
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 3(a).
F13
Substituted (19.12.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024), art. 3.
F14
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2004), art. 3(1)(a), (2).
F15
Substituted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 10(a).
F16
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(e).
Editorial Notes:
E1
Previous affecting provision: definitions of "RESS" and "RESS Contracts Notification" inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(d); substituted (19.12.2024) as per F-note above.
E2
Previous affecting provision: definition of "REFIT 3" inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(a)(i); substituted (27.09.2018) as per F-note above.
E3
Previous affecting provision: definition of "REFIT Contracts Notification" substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(a)(ii); substituted (27.09.2018) as per F-note above.
E4
Previous affecting provision: definition of "relevant supplier" inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(a)(i); substituted (20.02.2023) as per F-note above.
E5
Previous affecting provision: definitions of "REFIT Contracts Notification" and "REFIT power purchase agreement" and sub-art. (3C) inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), arts. 3(1)(b), 4; substituted (31.10.2012) as per E-note above.
E6
Previous affecting provision: definition of "AER VI Notification" substituted (20.07.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2005 (S.I. No. 380 of 2005), art. 3; substituted (27.09.2018) as per F-note above.
E7
Previous affecting provision: definition of "AER VI Notification" inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 3; substituted (20.07.2005) as per E-note above.
E8
Previous affecting provision: definition of "AER V Notification" inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 3(a)(i); substituted (27.09.2018) as per F-note above.
Direction to the Commission for Energy Regulation
F17[3. The Commission for Energy Regulation is directed to impose public service obligations—
(a) on the Board, to the extent that by virtue of this Order the obligations are to be imposed on the Board, and
(b) on suppliers, to the extent that by virtue of this Order the obligations are to be imposed on such suppliers,
in the terms set out in this Order.]
Annotations
Amendments:
F17
Substituted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 5.
Period of public service obligations
4. (1) The period of the public service obligations shall -
(a) as respects the obligations to be imposed pursuant to Article 5(1)(a) and (b), commence on the making of this Order,
F18[(b) as respects the obligations to be imposed pursuant to Article 5(1)(c) and (d) and Article 6(1), commence on 1 January 2003,]
F19[(bb) as respects the obligations to be imposed pursuant to Article 6(1A) commence as respects each PPA specified in Schedule 1A on the commercial operation date applicable to the F20[the PPA concerned,]]
F21[(bbb) as respects the obligations to be imposed pursuant to Article 6(1B), commence as respects each PPA specified in Schedule 1B on the commercial operation date applicable to the PPA concerned, and]
(c) as respects the obligation to be imposed pursuant to Article 5(1)(e) commence on such date or dates as will enable the Board to bring the generating stations into operation not later than the respective dates referred to in Article 5(1)(a) and (b),
and subject to the provisions of paragraph (2) and Articles 5 and 6, shall continue until 31 December 2019.
F22[(1A) The period of the public service obligation to be imposed pursuant to Article 6A commences on the date referred to at paragraph 2.5 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004 and, subject to paragraph (1C), continues until 1 May 2006.]
F22[(1B) The period of the public service obligation to be imposed pursuant to Article 6B commences on the date referred to at paragraph 2.5 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004 and, subject to paragraph (1D) and the terms of the contract specified in paragraph 2 of Part 1 of Schedule 1C, continues until 1 May 2006.]
F22[(1C) Notwithstanding paragraph (1A) the public service obligation imposed pursuant to Article 6A shall not continue beyond the date certified by the Commission to be the date on which both of the generating stations specified in Part 2 of Schedule 1C (and referred to at paragraph 2.5 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004) have commenced commercial operation.]
F22[(1D) Notwithstanding paragraph (1B) the public service obligation imposed pursuant to Article 6B shall not continue beyond the date certified by the Commission to be the date on which both of the generating stations specified in Part 2 of Schedule 1C (and referred to at paragraph 2.5 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004) have commenced commercial operation.]
F23[(1E) The period of the public service obligations to be imposed pursuant to Article 6C commences, as respects a particular CADA, on the date specified in column (3) of Part 3 of Schedule 1C which relates to such CADA, and, subject to paragraph (1F), continues until the date specified in column (4) of Part 3 of Schedule 1C.]
F23[(1F) (a) Subject to subparagraphs (b) and (c), and notwithstanding paragraph (1E) the public service obligations imposed pursuant to Article 6C shall not continue for a period in excess of 10 years as respects any particular CADA.
(b) The period of 10 years referred to in subparagraph (a) need not be a continuous or uninterrupted period where, by reason of force majeure as described in the CADA concerned, the period is interrupted.
(c) Notwithstanding subparagraphs (a) and (b), the obligations imposed pursuant to Article 6C shall not as respects any particular CADA continue beyond the date specified in column (5) of Part 3 of Schedule 1C which relates to such CADA.]
F24[(1G) The period of the public service obligations to be imposed pursuant to Article 6D shall commence in respect of a REFIT power purchase agreement listed in column 2 of Schedule 3, 4 or 5—
(a) in the case of a generator not registered in the Single Electricity Market pursuant to Regulation 5 of the Single Electricity Market Regulations, on the date on which the supplier purchases output which is exported for the purposes of distribution or transmission from the plant of the generator,
(b) in the case of a generator registered in the Single Electricity Market pursuant to Regulation 5 of the Single Electricity Market Regulations and a supplier registered as the intermediary for that generator, on the date on which the supplier purchases output which is exported for the purposes of transmission or distribution from the plant of the generator,
(c) in the case of REFIT 1 not later than 30 September 2015,
and
F25[(d) in the case of REFIT 2, not later than 31 March 2020.]]
F26[(1H) The period of the public service obligations to be imposed pursuant to Article 6E shall commence in respect of a RESS generator listed in column 2 of Schedule 6 -
(a) in the case of a generator not registered in the Single Electricity Market pursuant to Regulation 5 of the Single Electricity Market Regulations, on the date on which the supplier purchases output which is exported for the purposes of distribution or transmission from the plant of the generator, and
(b) in the case of a generator registered in the Single Electricity Market pursuant to Regulation 5 of the Single Electricity Market Regulations and a supplier registered as the intermediary for that generator, on the date on which the supplier purchases output which is exported for the purposes of transmission or distribution from the plant of the generator.]
F18[(2) Notwithstanding paragraph (1) the public service obligations shall not continue in respect of a particular PPA beyond -
(a) the date specified in column (3) of Part 1 of Schedule 1,
(b) the date specified in column (4) of Part 3 of F20[Schedule 1,]
(c) whichever of the dates referred to in Article 6(3) first occurs, F21[or]
F21[(d) whichever of the dates referred to in Article 6(5) first occurs,]
as it applies to the PPA concerned.]
Annotations
Amendments:
F18
Substituted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), arts. 4, 5.
F19
Inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 4.
F20
Substituted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), arts. 4(a), 5(a).
F21
Inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), arts. 4(b), 5(b), (c).
F22
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2004), art. 4.
F23
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), art. 4.
F24
Substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(a).
F25
Substituted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(c).
F26
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 4.
Editorial Notes:
E9
Previous affecting provision: sub-art. (1G)(d) substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(a); substituted (19.12.2014) as per F-note above.
E10
Previous affecting provision: sub-art. (1G) substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(c); substituted (19.12.2014) as per F-note above.
E11
Previous affecting provision: sub-art. (1G) substituted (3.11.2010) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2010 (S.I. No. 532 of 2010), art. 3(a); substituted (31.10.2012) as per E-note above.
E12
Previous affecting provision: sub-art. (1G) substituted (3.11.2009) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2009 (S.I. No. 444 of 2009), art. 3(a); substituted (3.11.2010) as per E-note above.
E13
Previous affecting provision: sub-art. (1G) inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 6; substituted (3.11.2009) as per E-note above.
Public service obligation for Peat
5. (1) There shall be imposed by the Commission on the Board a requirement to take such steps and make such arrangements as are necessary-
(a) construct and commission the peat generating station specified at paragraph 2 of Part 2of Schedule 1 in such manner as to ensure that such station is in operation not later than 28 February 2005, which station shall when constructed use indigenous peat as its primary energy fuel source and to ensure that, when constructed, and subject to the provisions of this Order, throughout the period referred to in Article 4, which relates to that generating station, the Board has available to it the amount of electricity generated by that generating station; and
(b) to construct and commission the peat generating station specified at paragraph 3 of Part 2 of Schedule 1 in such manner as to ensure that such station is in operation not later than 1 January 2005, which station shall when constructed use indigenous peat as its primary energy fuel source and to ensure that, when constructed, and subject to the provisions of this Order, throughout the period referred to in Article 4, which relates to that generating station, the Board has available to it the amount of electricity generated by that generating station; and
(c) to secure that, with effect from 1 January 2003, the Board has available to it and purchases the amount of electricity generated by the generating station the subject matter of the PPA referred to in Part 1 of Schedule 1 being a generating station which uses indigenous peat as its primary energy fuel source, and to ensure that, subject to the provisions of this Order, throughout the period referred to in Article 4 the Board has available to it the amount of electricity generated by that generating station; and
(d) to secure that, with effect from 1 January 2003, subject to paragraph (2) the Board has available to it and purchases the amount of electricity generated by the generating stations referred to in paragraph 1 of Part 2 of Schedule 1 being generating stations which use indigenous peat as their primary energy fuel source, and to ensure that, subject to the provisions of this Order, throughout the period referred to in Article 4 the Board has available to it the amount of electricity generated by those generating stations, and
(e) to purchase such amount of peat harvested within the State as is required to generate the electricity to be produced by the generating stations referred to in F27[subparagraphs (a) and (b)] on terms having equivalent economic effect (as determined by the Commission) as the terms of the fuel supply agreement made between Bord na Mona and Edenderry Power Limited which agreement relates to the generating station referred to at paragraph 1 of Part 1 of Schedule 1,
provided that the amount of peat used in any calendar year to generate that electricity shall not exceed 15 per cent of the overall primary energy necessary to produce the electricity consumed in the State in that year.
(2) The obligation to have available to it, and purchase, as appropriate, the electricity generated by the stations referred to at paragraph 1 of Part 2 of Schedule 1 shall not require the Board to have available to it, and purchase, as appropriate, such electricity from any of the individual stations for a period beyond the date specified in paragraph 4.16 of the Notification as the projected closure date in respect of each station concerned.
(3) The obligation to have available to it, and purchase, as appropriate, the electricity generated by the stations referred to at paragraphs 2 and 3 of Part 2 of Schedule 1 shall not require the Board to have available to it, and purchase, as appropriate, such electricity for a period in excess of 15 years and in any event not beyond 31 December 2019.
(4) The obligation to have available to it, and purchase, as appropriate, the electricity generated by the stations referred to at paragraph 1 of Part 2 of Schedule 1 shall not require the Board to have available to it, and purchase, as appropriate, such electricity from the Rhode U3 generating unit, the Board, having determined that the generating unit concerned is beyond economic repair.
Annotations
Amendments:
F27
Substituted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 10(b).
Public service obligation for Renewable, Sustainable or Alternative forms of energy
6. (1) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it and purchase electricity generated pursuant to the contracts listed in Part 3 of Schedule 1 for the respective terms of those contracts.
F28[(1A) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it and purchase electricity generated pursuant to the PPAs listed in Schedule 1A for the respective terms of those contracts.]
F29[(1B) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it and purchase electricity generated pursuant to the PPAs listed in Schedule 1B for the respective terms of those contracts.]
(2) The obligation referred to in paragraph (1) shall not in any event continue beyond 31 December 2014.
F28[(3) The period of the obligation referred to in paragraph (1A) as respects an individual generating station shall determine:
(a) on 31 December 2018,
(b) on the date nominated by a third party producer to the Board as the date upon which the generating station concerned specified in Schedule 1A will cease to supply electricity to the Board in accordance with the terms of the PPA concerned, or
(c) on the date which is 15 years from the date of commercial operation of the generating station concerned,
whichever first occurs.]
F28[(4) The obligation on the Board to have available to it and purchase, as appropriate, the electricity generated by the stations specified in Schedule 1A shall not require the Board to have available to it, or purchase, as appropriate, such electricity from any individual station -
(a) where the station is not generating electricity for supply to the Board, or
(b) after the date nominated by a third party producer to the Board as the date upon which a station specified in Schedule 1A will cease to supply electricity to the Board in accordance with the terms of the PPA.]
F30[(5) The period of the obligation referred to in paragraph (1B) shall—
(a) as respects an individual generating station specified in Part 1 of Schedule 1B determine—
(i) on 31 December 2019, or
(ii) on the date which is 15 years from the date of commercial operation of the generating station concerned,
whichever first occurs,
(b) as respects and individual generating station specified in Part 2 of Schedule 1B, determine—
(i) on 31 December 2021, or
(ii) on the date which is 15 years from the date of commercial operation of the generating station concerned,
whichever first occurs,
and
(c) as respects an individual generating station specified in Part 3 of Schedule 1B determine—
(i) on 31 December 2016, or
(ii) on the date which is 10 years from the date of commercial operation of the generating station concerned,
whichever first occurs.]
F29[(6) The obligation on the Board to have available to it, and purchase, as appropriate, the electricity generated by the stations specified in Schedule 1B shall not require the Board to have available to it, or purchase, as appropriate, such electricity from any individual station where the station is not generating electricity for supply to the Board.]
F29[(7) Notwithstanding Article 6(5), where a contract is specified in Schedule 1A and Schedule 1B which relates to the same generating station, the obligation of the Board shall determine on the date which is 15 years from the date of first commercial operation of the generating station concerned.]
Annotations
Amendments:
F28
Inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 6(a), (b).
F29
Inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 6(a), (b).
F30
Substituted (20.07.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2005 (S.I. No. 380 of 2005), art. 4.
Editorial Notes:
E14
Previous affecting provision: sub-art. (5) inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 6(b); substituted (20.07.2005) as per F-note above.
F31[Public service obligation for short-term peaking capacity
6A. (1) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it short-term peaking capacity and purchase electricity so generated by the peaking generation units listed in paragraph 1 of Part 1 of Schedule 1C.
(2) The obligation to have available to it, and purchase as appropriate, the electricity generated by the generating stations referred to at paragraph 1 of Part 1 of Schedule 1C shall not require the Board to have available to it, and purchase, as appropriate, such electricity beyond the date certified by the Commission to be the date on which both of the generating stations specified in Part 2 of Schedule 1C (and referred to at paragraph 2.5 of EU Commission Decision Reference C(2004) 2632 fin dated 14 July 2004) have commenced commercial operation.]
Annotations
Amendments:
F31
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 5.
F32[Public service obligation for short-term capacity
6B. (1) There shall be imposed by the Commission on the Board a requirement that the Board take such steps and make such arrangements as may be necessary to have available to it and purchase as appropriate capacity and electricity pursuant to the VIPP Capacity and Energy Agreement dated 17 July 2003 specified in paragraph 2 of Part 1 of Schedule 1C.
(2) The obligation to have available to it, and purchase as appropriate, the electricity generated pursuant to the contract referred to at paragraph 2 of Part 1 of Schedule 1C shall not require the Board to have available to it, and purchase, as appropriate, such electricity beyond the date—
(a) which is certified by the Commission to be the date on which both of the generating stations specified in Part 2 of Schedule 1C (and referred to at paragraph 2.5 of EU Commission Decision Reference C(2004 2632 fin dated 14 July 2004) have commenced commercial operation, or
(b) on which the contract specified in paragraph 2 of Part 1 of Schedule 1C is determined pursuant to the terms of that contract.]
Annotations
Amendments:
F32
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 5.
F33[Public service obligation for generation contracts
6C. (1) There shall be imposed by the Commission on the Board a requirement that the Board, subject to the provisions of this Article, make payments in accordance with the CADAs referred to at Part 3 of Schedule 1C, for the respective terms of those contracts.
(2) Subject to paragraphs (3) and (4), the obligation to make payments in accordance with the CADAs referred to at Part 3 of Schedule 1C, shall not, as respects the counterparty to a particular CADA, require the Board to make such payments for a period in excess of 10 years.
(3) The period of 10 years referred to in paragraph (2) need not be a continuous or uninterrupted period where, by reason of force majeure as described in the CADA concerned, the period is interrupted.
(4) Notwithstanding paragraphs (2) and (3) the obligation referred to in paragraph (1) shall not as respects a particular CADA continue beyond the date specified in column (5) of Part 3 of Schedule 1C which relates to such CADA.
(5) Notwithstanding paragraphs (1) to (4) the obligation of the Board to make payments in accordance with the CADAs shall, as respects a particular CADA, stand amended, if at any time prior to the termination date specified at column (4) or (5) of Part 3 of Schedule 1C, the counterparty specified in column (1) of Part 3 of Schedule 1C exercises its right to reduce the quantity of electricity in respect of which it is obliged to declare availability under the CADA so that the obligation of the Board in respect of such CADA shall thereafter be limited to making payments in respect of such reduced quantity of electricity.]
Annotations
Amendments:
F33
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), art. 5.
F34[Public service obligation for REFIT contracts
F35[6D. (1) There shall be imposed by the Commission on each supplier specified in column (3) a requirement that pursuant to the REFIT power purchase agreement specified at that reference number, such supplier have available to it and purchase the electricity generated by the generation plant specified at that reference number in column (5), by the generator specified at that reference number in column (4), which electricity shall be generated from the energy source specified at that reference number in column (6) and which electricity is the subject of the REFIT power purchase agreement concerned.
F36[(2) The obligation imposed pursuant to paragraph (1) shall not, as respects a supplier referred to in column (3), require that supplier to have available to it and purchase the electricity concerned—
(a) for a period in excess of F37[15 years,]
(b) in the case of—
(i) REFIT 1, after 31 December 2027,
(ii) REFIT 2, after F37[31 December 2030,]
(iii) REFIT 3, after 31 December 2030.]
(c) F38[…]
F39[(d) where a generator has generated electricity from bioliquids and where the generator has not satisfied the Commission that the bioliquids have fulfilled the sustainability and greenhouse gas emissions saving criteria referred to in Regulation 6 of the European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022).]
F40[(e) where a generator has generated electricity from biomass fuels and where the generator has not satisfied the Commission that the biomass fuels have fulfilled the sustainability and greenhouse gas emissions saving criteria referred to in Regulation 6 of the European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022).]
(3) A reference in this Article to a column is a reference to a column of the Table in Schedule 3, 4 or 5.]]
Annotations
Amendments:
F34
Inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 7.
F35
Substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(d).
F36
Substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(b).
F37
Substituted (23.10.2014) by European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), art. 24(1)(b)(i), (ii). Note that the amendment substitutes "31 December 2030, or" whereas the previous text was "31 December 2032, and".
F38
Deleted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(b).
F39
Substituted (15.07.2022) by European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 16(1)(b)(i), in effect as per reg. 1(2).
F40
Inserted (15.07.2022) by European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022), reg. 16(1)(b)(ii), in effect as per reg. 1(2).
Editorial Notes:
E15
Para. (2)(c) purported to be amended (23.10.2014) by European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), reg. 24(1)(b)(iii); para. (2)(c) impliedly deleted by substitution of para. (2) (25.10.2013) as per F-note above.
E16
Previous affecting provision: sub-art. (2)(d) inserted (23.10.2014) by European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014), art. 24(1)(b)(iv); substituted (15.07.2022) as per F-note above.
F41[Public service obligation for RESS contracts
6E. (1) There shall be imposed by the Commission on each supplier specified in column (3) of Schedule 6 a requirement that, pursuant to the RESS PPA for the project specified in column (2) at that reference number, such supplier have available to it and purchase the electricity generated by the generator specified at that reference number in column (4), which electricity shall be generated from the energy source specified at that reference number in column (5) and which electricity is the subject of the RESS PPA concerned.
(2) The obligation imposed pursuant to paragraph (1) shall not, as respects a supplier specified in column (3), require that supplier to have available to it and purchase the electricity concerned after the termination of the RESS PPA concerned by the generator specified in column (4) at that reference number in accordance with the terms of that agreement which shall be in conformity with the RESS Contracts Notification.
(3) A reference in this Article to a column is a reference to a column of the Table in Schedule 6.]
Annotations
Amendments:
F41
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 5.
Public service obligations Levy
7. F42[(1) Following a calculation by the Commission under Article 8 that results in an additional cost, there shall be a levy in respect of the matters provided for in this Order, which shall be known as the public service obligations levy, and is in this Order referred to as the PSO Levy, which levy shall be estimated, calculated, adjusted, collected, monitored, certified, accounted for and paid in accordance with the provisions of this Order.]
(2) The PSO Levy shall commence on 1 January 2003.
(3) F43[Subject to F44[paragraphs (4) and (5)], F42[the PSO Levy or PSO Payment, as the case may be, imposed by this Article and Article 7A respectively]] shall terminate no later than 31 December 2021.
F45[(4) In respect of the obligation imposed by Article 6D F42[the PSO Levy or PSO Payment, as the case may be, imposed] shall terminate—
(a) in the case of REFIT 1, no later than 31 December 2029,
(b) in the case of REFIT 2, no later than 31 December 2034, and
(c) in the case of REFIT 3, no later than 31 December 2032.]
F46[(5) In respect of the obligation imposed by Article 6E, F42[the PSO Levy or PSO Payment, as the case may be, imposed] shall terminate not later than the end of the period specified in the terms and conditions of the relevant RESS competition.]
Annotations
Amendments:
F42
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 4(a), (b), (c), (d).
F43
Substituted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 8(a).
F44
Substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 6(a).
F45
Substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(c).
F46
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 6(b).
Editorial Notes:
E17
Previous affecting provision: sub-art. (4) substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(e); substituted (25.10.2013) as per F-note above.
E18
Previous affecting provision: sub-art. (4) inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 8(b); substituted (31.10.2012) as per E-note above.
F47[Public service obligations payment
7A. Following a calculation by the Commission under Article 8 that results in an additional benefit, a payment shall be made in respect of the matters provided for in this Order, which shall be known as the public service obligations payment, in this Order referred to as the PSO Payment, which shall be estimated, calculated, adjusted, collected, monitored, certified, accounted for and paid in accordance with the provisions of this Order.]
Annotations
Amendments:
F47
Inserted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 5.
Calculation of PSO Levy amount - constituent elements
8. (1) F48[The amount of the PSO Levy or PSO Payment in respect of a particular levy, or payment, period, as the case may be, shall] be the aggregate of
(a) F48[the additional costs of, or additional benefits to,] the Board in the period concerned in complying with the obligation imposed on it by Article 5, as determined by the Commission pursuant to Article 9;
(b) F48[the additional costs of, or additional benefits to,] the Board in the period concerned in complying with the obligation imposed on it by Article 6, as determined by the Commission pursuant to Article 9;
F49[(bb) F48[the additional costs of, or additional benefits to,] the Board in the period concerned in complying with the obligation imposed on it by Article 6A, as determined by the Commission pursuant to Article 9;]
F49[(bc) F48[the additional costs of, or additional benefits to,] the Board in the period concerned in complying with the obligation imposed on it by Article 6B, as determined by the Commission pursuant to Article 9;]
F50[(bd) F48[the additional costs of, or additional benefits to,] the Board in the period concerned in complying with the obligation imposed on it by Article 6C, as determined by the Commission pursuant to Article 9;]
F51[(be) F48[the additional costs of, or additional benefits to,] suppliers in the period concerned in complying with the obligation imposed on it by Article 6D, as determined by the Commission pursuant to Article 9;]
F52[(bf) F48[the additional costs of, or additional benefits to,] suppliers in the period concerned in complying with the obligation imposed on it by Article 6E, as determined by the Commission pursuant to Article 9;]
(c) the administrative expenses incurred by suppliers and the distribution system operator in the period concerned in F48[collecting payment of the PSO Levy, or making the PSO Payment,] as determined by the Commission pursuant to Article 9;
(d) the administrative expenses incurred by the transmission system operator in the period concerned in F48[collecting payment of the PSO Levy, or making the PSO Payment,] as determined by the Commission pursuant to F48[Article 9;]
F53[(e) the over, or under, recovery of additional costs or of additional benefits, arising in a previous payment period or levy period.]
(2) Additional costs of the Board shall not be included in the determination of additional costs by the Commission-
(a) unless those costs are in accordance with the method for determination of costs provided for in the Notification F54[or the AER V Notification] F55[or the AER VI Notification] F49[or the Short-Term Peaking Generation Notification] F50[or the Generation Contracts Notification] F51[or the F56[the REFIT Contracts Notification or the RESS Contracts Notification]], and
(b) where the costs arise as a result of the operation of a power station specified in paragraph 1 of Part 2 of Schedule 1 beyond the date projected for closure of that station and which date is specified at paragraph 4.16 of the Notification.
(3) The closure costs relating to the Rhode U3 generating unit provided for in the Notification shall be treated as additional costs for the purposes of paragraph 1(a) in such earlier levy period or periods as they are actually incurred.
(4) Where costs have been incurred by the Board in complying with the obligations imposed on it by Article 5(1)(a) and (b) and due to reasons outside the control of the Board (to the satisfaction of the Commission) compliance with the terms of those obligations is prevented, such costs shall be treated by the Commission as additional costs of the Board in complying with its obligations under Article 5(1)(a) and (b) subject to any obligation on the Minister to notify the EU Commission of the circumstances and subject to a favourable decision being obtained in respect of such notification.
Annotations
Amendments:
F48
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 6(a)-(d).
F49
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), arts. 6, 7.
F50
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), arts. 6, 7.
F51
Inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 9(a), (c).
F52
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 7(a).
F53
Inserted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 6(e).
F54
Inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 7.
F55
Inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 7.
F56
Substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 7(b).
Estimation of PSO Levy
9. (1) (a) The Commission shall apportion the amount of F57[PSO Levy payable, if any, following the calculation in Article 8, in each levy period] in respect of each category of electricity accounts in the State in accordance with the terms of section 39 and Schedule 2 of the Act, and
(b) the Commission shall compute the basis of the amount of PSO Levy payable in each levy period in respect of each electricity account in the State in accordance with the terms of section 39 and Schedule 2 of the Act.
F58[(1A) (a) The Commission shall apportion the amount of PSO Payment to be credited in each payment period, if any, following the calculation in Article 8, in respect of each category of electricity accounts in the State in accordance with the terms of section 39 and Schedule 2 of the Act.
(b) The Commission shall compute the basis of the amount of PSO Payment to be credited, if any, in each payment period in respect of each electricity account in the State in accordance with the terms of section 39 and Schedule 2 of the Act.]
(2) The PSO Levy in the first levy period to 31 December 2003 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at F59[subparagraphs (a) to (d)] of Article 8(1)and any over recovery or under recovery of those amounts in the period ending on 31 December 2003 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2005.
F60[(2A) The PSO Levy in respect of the requirement imposed pursuant to Article 6A in the levy period to 31 December 2005 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bb) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2005 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2007.]
F60[(2B) The PSO Levy in respect of the requirement imposed pursuant to Article 6B in the levy period to 31 December 2005 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bc) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2005 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2007.]
F60[(2C) The PSO Levy in respect of the requirement imposed pursuant to Article 6A in the levy period to 31 December 2006 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bb) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2006 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2008.]
F60[(2D) The PSO Levy in respect of the requirement imposed pursuant to Article 6B in the levy period to 31 December 2006 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bc) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2006 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2008.]
F61[(2E) The PSO Levy in respect of the requirement imposed pursuant to Article 6C in the levy period to 31 December 2006 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bd) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2006 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 January 2008.]
F61[(2F) The PSO Levy in respect of the requirement imposed pursuant to Article 6C in the levy period to 31 December 2007 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at subparagraph (bd) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 31 December 2007 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 October 2008.]
F62[(2G) The PSO levy in respect of the requirement imposed pursuant to Article 6D in the levy period to 30 September 2008 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at paragraph (be) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 30 September 2008 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 October 2010.]
F62[(2H) The PSO levy in respect of the requirement imposed pursuant to Article 6D in the levy period to 30 September 2009 shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified at paragraph (be) of Article 8(1) and any over recovery or under recovery of those amounts in the period ending on 30 September 2009 shall be taken into account in setting the amount of PSO Levy in respect of the levy period commencing on 1 October 2011.]
F57[(2I) In respect of the obligation imposed by Article 6D in any single levy, or payment, period, the PSO Levy or PSO Payment, as the case may be, shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the costs and expenses specified in Article 8(1)(be) and any over recovery, or under recovery, of those amounts in that levy, or payment, period shall be taken into account in setting the amount of the PSO Levy or PSO Payment in respect of the levy, or payment in a future levy, or payment, period.]
F57[(2J) In respect of the obligation imposed by Article 6E in any single levy, or payment, period, the PSO Levy or PSO Payment, as the case may be, shall be determined by the Commission on the basis of the estimates made by it of the amounts required to meet the additional costs, or benefits, and expenses specified in Article 8(1)(bf) and any over recovery, or under-recovery, of those amounts in that levy, or payment, period shall be taken into account in setting the amount of the PSO Levy or PSO Payment in respect of the levy, or payment, in a future levy, or payment, period.]
(3) F57[The following arrangements shall apply in relation to the PSO Levy or PSO Payment, as the case may be, in respect of each subsequent levy, or payment, period:]
(a) F63[At least 5 months prior to the commencement of] a levy period, the Board shall provide the Commission with an estimate of the total amount of the additional costs, calculated in accordance with the method specified for determination of such costs in the Notification F64[or the AER V Notification] F65[or the AER VI Notification] F60[or the Short-Term Peaking Generation Notification] F61[or the Generation Contracts Notification], that the Board estimates it will incur in the forthcoming levy period in complying with its obligations under this Order and the Board shall separately identify within its aggregate estimates, separate estimates for:
(i) the additional costs, which will be incurred by the Board in the levy period concerned in complying with the obligation imposed on it by Article 5,
(ii) the additional costs, which will be incurred by the Board in the levy period concerned in complying with the obligation imposed on it by Article 6,
F60[(iii) the additional costs, which will be incurred by the Board in the levy period concerned in complying with the obligation imposed on it by Article 6A,]
F60[(iv) the additional costs, which will be incurred by the Board in the levy period concerned in complying with the obligation imposed on it by Article 6B,]
F61[(v) the additional costs, which will be incurred by the Board in the levy period concerned in complying with the obligation imposed on it by Article 6C.]
F66[(ab)(i) At least 5 months prior to the commencement of a F57[levy, or payment, period] each relevant supplier shall provide the CER with an estimate of the F57[additional costs and benefits], calculated in accordance with the method specified for determination of such costs in the REFIT Contracts Notification as applied by CER in any relevant decision on the calculation of REFIT costs that such supplier estimates it will incur in the next F57[levy, or payment, period] in complying with its obligations under this Order in respect of each REFIT power purchase agreement to which it is a party.
(ii) A relevant supplier may only receive payment from the F57[PSO Levy or PSO Payment fund, as the case may be] in respect of each REFIT PPA to which it is a party in any given F57[levy, or payment, period] when the specific REFIT PPA is specified in column 2 of the Schedule 3, 4 or 5 and when the relevant supplier—
(I) has been included in both the F57[PSO levy and payment decision] taken by the CER for the specific F57[levy, or payment, period], and
(II) is included in column 3 of Schedule 3, 4 or 5.]
F57[(ac) (i) At least 5 months prior to the commencement of a levy, or payment, period each relevant supplier shall provide the Commission with an estimate of the additional costs or benefits, calculated in accordance with the method specified for determination of such costs, or benefits, in the RESS Contracts Notification, or as applied by the Commission in any relevant decision on the calculation of RESS costs or benefits that such supplier estimates it will incur, or receive, in the next levy, or payment, period, as the case may be, in complying with its obligations under this Order in respect of each RESS PPA to which it is a party.
(ii) A relevant supplier may only receive payment from the PSO Levy or PSO Payment fund, as the case may be, in respect of each RESS PPA to which it is a party in any given levy, or payment, period when the specific RESS project is specified in Schedule 6 and when the relevant supplier—
(I) has been included in both the PSO levy and payment decision taken by the Commission for the specific levy period, and
(II) has commenced generation or, as determined by the Commission, is in a position to commence generating.]
(b) F63[At least 5 months prior to the commencement of] a F57[levy, or payment, period] -
(i) all suppliers,
(ii) the distribution system operator, and
(iii) the transmission system operator
shall provide the Commission with an estimate of the amount of the administrative expenses that each such person estimates it will incur in the forthcoming F57[levy, or payment, period] in complying with its duties under this Order together with such further information as the Commission may specify.
(c) F63[At least 3 months prior to the commencement of a F57[levy, or payment, period]] the Commission shall notify all suppliers, the Board, the distribution system operator and the transmission system operator of-
F57[(i) its estimate in respect of the forthcoming levy or payment period of the total amount of the PSO Levy or PSO Payment, as the case may be, and of each component making up—
(I) that levy, or
(II) that payment,
as specified in Article 8(1),]
(ii) its estimate in respect of any over recovery or under recovery of the amounts required to meet the costs and expenses specified at F59[subparagraphs (a) to (d)] of Article 8(1) in any earlier F57[levy, or payment, period],
(iii) the proportion of the maximum demand attributed to each category of electricity accounts pursuant to section 39 of the Act,
(iv) the basis of the calculation of the amount to be F57[paid by, or credited, to, final customers] in each category in respect of the forthcoming F57[levy, or payment, period], and
F57[(v) its estimate of the PSO Levy or PSO Payment amount per electricity account for Domestic Accounts and Small Accounts and the PSO Levy or PSO Payment per kVA of maximum import capacity for Medium-Large Accounts.]
(d) Each notified person may make representations to the Commission within 15 days of receiving the notice referred to in paragraph (3)(c) and the Commission shall have due regard to any representations made.
(e) The Commission shall make a final determination of-
F57[(i) its estimate in respect of the forthcoming levy, or payment, period of the total amount of the PSO Levy or PSO Payment, as the case may be, and of each component making up—
(I) that levy, or
(II) that payment,
as specified in Article 8(1),]
(ii) its estimate in respect of any over recovery or under recovery of the amounts required to meet the costs and expenses specified at F59[subparagraphs (a) to (d)] of Article 8(1) in any earlier F57[levy, or payment, period],
(iii) the proportion of the maximum demand attributed to each category of electricity accounts pursuant to section 39 of the Act,
(iv) the basis of the calculation of the amount to be F57[paid by, or credited to, final customers] in each category in respect of the forthcoming F57[levy, or payment, period],
F57[(v) its estimate of the PSO Levy or PSO Payment, as the case may be, per electricity for Domestic Accounts and Small Accounts and the PSO Levy or PSO Payment per kVA of maximum import capacity for Medium-Large Accounts,]
F57[(f) The PSO Levy or PSO Payment, as the case may be, shall be allocated among final customers pursuant to paragraph (1) of this Article, collected pursuant to Article 11, accounted for pursuant to Articles 12 and 13 and paid by, or credited to, final customers pursuant to Article 16 on the basis of the determination of the Commission notified in accordance with paragraph (3)(e),]
F67[(g) The Commission shall notify all suppliers, the Board, the distribution system operator and the transmission system operator of any change to the commencement F57[date of a levy period, or payment period, at least] 6 months in advance of that date.]
F58[(4) Where, during a levy period or payment period, the Commission estimates the amounts required to meet the PSO Levy or PSO Payment as previously calculated in accordance with Article 8(1) are likely to differ significantly from—
(a) the estimates provided to it in accordance with Article 9(3), or
(b) the amounts in respect of the PSO Levy or PSO payment actually received, or likely to be received, into the levy, or payment, fund,
the Commission may—
(i) revise their determination of the levy or payment amount for the remainder of the levy period or payment period concerned in accordance with paragraph (3)(e), and
(ii) notify all suppliers, the Board, the distribution system operator and the transmission system operator accordingly,
and Articles 11 to 13, and 16, shall apply on the basis of the Commission’s redetermination.]
F58[(5) Where, during a levy period or payment period, the Commission becomes aware of significant inaccuracies in the estimates previously provided to it in accordance with paragraph (3), the Commission may request a supplier to provide a new estimate for that levy period or payment period in regard to a specified project.]
Annotations
Amendments:
F57
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 7(a), (c), (d), (e)(i)-(viii).
F58
Inserted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 7(b), (f).
F59
Substituted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 10(c), (d), (e).
F60
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), arts. 8, 9(a), (b).
F61
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), arts. 8, 9(a), (b).
F62
Inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 10(a).
F63
Substituted (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(b), (c), (d).
F64
Inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 8.
F65
Inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2002), art. 8.
F66
Substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(f)(ii).
F67
Inserted (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(g).
Editorial Notes:
E19
Previous affecting provision: sub-art. (3)(f) amended (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(f); substituted (20.02.2023) as per F-note above.
E20
Previous affecting provision: sub-art. (3)(e)(v) amended (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(e); substituted (20.02.2023) as per F-note above.
E21
Previous affecting provision: sub-art. (3)(ac) inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 8(b); substituted (20.02.2023) as per F-note above.
E22
Previous affecting provision: sub-art. (2J) inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 8(a); substituted (20.02.2023) as per F-note above.
E23
Previous affecting provision: sub-art. (2I) inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(f)(i); substituted (20.02.2023) as per F-note above.
E24
Previous affecting provision: sub-art. (3)(ab) inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 10(b); substituted (31.10.2012) as per F-note above.
Certification of PSO Levy
10. (1) F68[No later than 7 months after the end of each F69[levy, or payment, period]-]
(a) the Board shall provide to the Commission details of the actual additional costs incurred by it in complying with the obligation imposed on it by F70[Articles 5, 6, 6A, 6B and 6C], and
F71[(ab) each supplier on whom an obligation is imposed by Article 6D shall provide the Commission details of the actual F69[additional benefits or costs] incurred by that supplier in complying with the obligation imposed on it by that Article, and]
F72[(ac) each supplier on whom an obligation is imposed by Article 6E shall provide details to the Commission of the actual F69[additional benefits or costs] incurred by that supplier in complying with the obligation imposed on it by that Article, and]
(b) suppliers, the distribution system operator and the transmission system operator shall provide details to the Commission of the actual administrative expenses incurred by them and referred to in Article 8(1)(c) and (d),
together in each case with a separate auditors' certificate, F73[detailing the actual amounts of the costs and expenses referred to in subparagraphs (a), (ab) and (b)], as appropriate, and certifying that the costs and expenses in question have been incurred and the amounts recorded have been properly extracted from the books and records of the company.
F69[(2) Within 60 days of the receipt of all the information referred to in paragraph (1), the Commission shall certify the total amount of the PSO Levy or PSO Payment, as the case may be, in respect of the period concerned and shall separately certify the amount of each constituent element of—
(a) that levy, or
(b) that payment,
as specified in Article 8(1).]
F69[(3) If the amount of any of the constituent elements mentioned in paragraph (2), in respect of a levy, or payment, period as certified by the Commission pursuant to paragraph (2) differs from the amount determined by the Commission pursuant to Article 7, 7A or Article 9(3)(e) as forming part of the PSO Levy or PSO Payment, as the case may be, in respect of the period concerned, the determination of the amount due in respect of the levy for the levy period, or payment for the payment period, next commencing shall be adjusted to provide for the over recovery or under recovery of the PSO Levy or PSO Payment in the earlier levy period, or payment period, concerned.]
Annotations
Amendments:
F68
Substituted (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(h).
F69
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 8(a)(i)-(iii), (b).
F70
Substituted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), art. 10.
F71
Inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 11(a).
F72
Inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 9.
F73
Substituted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 11(b).
Editorial Notes:
E25
Previous affecting provision: sub-art. (2) amended (14.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007), art. 2(i); substituted (20.02.2023) as per F-note above.
E26
Previous affecting provision: sub-art. (1)(a) amended (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 10; substituted (30.07.2007) as per F-note above.
F74[Duty of suppliers with regard to PSO Levy and PSO Payment
11. It shall be the duty of each supplier to—
(a) account to the Commission, the transmission system operator or distribution system operator, as appropriate, for all transactions relating to the PSO Levy or PSO Payment,
(b) pay any additional benefits due under Article 8(1) to the transmission system operator,
(c) invoice final customers for the PSO Levy or credit final customers for the PSO Payment on the basis notified to them by the Commission,
(d) collect from final customers the amount of the PSO Levy or credit to final customers the amount of the PSO Payment payable in respect of each such final customer account in accordance with the provisions of Schedule 2, and
(e) pay to the transmission system operator or distribution system operator, as appropriate, all amounts invoiced by such supplier in respect of the PSO Levy.]
Annotations
Amendments:
F74
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 9.
F75[Duty of distribution system operator with regard to PSO Levy and PSO Payment
12. It shall be the duty of the distribution system operator, in accordance with Schedule 2, to—
(a) account to the Commission or transmission system operator, as appropriate, for all transactions relating to the PSO Levy or PSO Payment,
(b) collect from suppliers payments of the PSO Levy paid by final customers,
(c) pay to the transmission system operator all appropriate amounts received by it in respect of the PSO Levy from suppliers, collected from final customers connected to the distribution system,
(d) receive from the transmission system operator amounts received in respect of the PSO Payment, and
(e) pay to suppliers the amount of the PSO Payment to be credited to connected final customers connected to the distribution system, in respect of each supplier supplier’s distribution, as appropriate in each case.]
Annotations
Amendments:
F75
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 9.
F76[Duty of transmission system operator with regard to PSO Levy or PSO Payment
13. It shall be the duty of the transmission system operator, in accordance with Schedule 2, to—
(a) account to the Commission for all transactions relating to the PSO Levy or PSO Payment,
(b) collect any additional benefits due, under Article 8(1) from the Board or relevant suppliers connected to the transmission system, as applicable,
(c) collect from suppliers payments of the PSO Levy paid by final customers connected to the transmission system,
(d) pay to suppliers the amount in respect of the PSO Payment to be credited to final customers connected to the transmission system, as appropriate,
(e) receive from the distribution system operator amounts received in respect of the PSO Levy, and
(f) pay to the distribution system operator the amounts in respect of the PSO Payment to be paid to suppliers.]
Annotations
Amendments:
F76
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 9.
Duty of distribution system operator to account to transmission system operator for PSO Levy
14. F77[…]
Annotations
Amendments:
F77
Deleted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 9.
Duty of transmission system operator to account to the Board for PSO Levy
15. F78[…]
Annotations
Amendments:
F78
Deleted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 9.
Editorial Notes:
E27
Previous affecting provision: sub-para. (c) substituted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 12; article deleted (20.02.2023) as per F-note above.
Duty of final customers to pay PSO Levy
16. It shall be the duty of each final customer, which duty is owed to the electricity supplier which invoices such customer, to pay to that supplier the amount of the PSO Levy properly invoiced to such customer in accordance with this Order.
F79[Duty of distribution system operator and transmission system operator to inform Commission as to level of PSO Levy amounts received or PSO Payment amounts made
17. It shall be the duty of the distribution system operator and transmission system operator to inform the Commission if the level of payments received by them in respect of the PSO Levy or PSO Payment is materially different from that anticipated by the Commission as being payable in respect of a particular levy period or payment period, as the case may be, and advised by the Commission to them and of the measures being taken to recover amounts due.]
Annotations
Amendments:
F79
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 10.
F80[Recovery of PSO Levy amounts due or PSO Payment amounts made
18. A supplier, the distribution system operator and the transmission system operator may recover as a simple contract debt in any court of competent jurisdiction, any amount due and owing in respect of the PSO Levy or PSO Payment, from each person who has, by virtue of this Order, a duty to pay the PSO Levy or PSO Payment to such supplier, the distribution system operator, the transmission system operator or the final customer, as the case may be.]
Annotations
Amendments:
F80
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 10.
CER supervision
19. (1) Each person, other than a final customer, who has any duties imposed on him or her pursuant to this Order shall submit a document to the Commission for approval in such form as may be required by the Commission from time to time specifying the procedures which he or she will adopt in order to comply with those duties and, when approved by the Commission, shall comply with those procedures.
F81[(2) The document mentioned in paragraph (1) shall specify such procedures as may be necessary or expedient in order to secure the proper performance by each such person of his or her duties pursuant to this Order, including the following:
(a) in the case of the Board or suppliers, as the case may be, in respect of the following:
(i) the procedures according to which each constituent element of the PSO Levy or PSO Payment specified in Article 8(1) of this Order will be estimated;
(ii) the dates by which those persons will provide the information required by this Order to the Commission and the format in which such information shall be supplied;
(b) in the case of suppliers, the procedures suppliers propose to adopt in respect of the following:
(i) for the invoicing of the PSO Levy or crediting of the PSO Payment to final customers, including the format of invoices;
(ii) for ensuring the collection of the PSO Levy from, or crediting of the PSO Payment to, final customers;
(iii) for calculating their administrative expenses involved in the collection of the PSO Levy or crediting of the PSO Payment;
(iv) for making or collecting payments of amounts in respect of the PSO Levy collected from, or PSO Payments to be credited to, the distribution system operator and transmission system operator, as appropriate;
(c) in the case of the distribution system operator, the procedures which the distribution system operator proposes to adopt in respect of the following:
(i) for the collection and recovery of amounts in respect of the PSO Levy from suppliers who collect it from final customers connected to the distribution system payments of amounts in respect of the PSO Payment, in accordance with Schedule 2, to suppliers who credit the PSO Payment to final customers connected to the distribution system;
(ii) for the calculation of its administrative expenses involved in the collection of the PSO Levy or payment of the PSO Payment;
(iii) for the onward payment of amounts received in respect of the PSO Levy to the transmission system operator;
(d) in the case of the transmission system operator, the procedures which the transmission system operator proposes to adopt in respect of the following:
(i) for the collection and recovery of amounts in respect of the PSO Levy from suppliers who collect it from final customers connected to the transmission system, or for the collection and recovery of amounts in respect of the PSO Payment from relevant suppliers, and from the distribution system operator;
(ii) for the calculation of its administrative expenses involved in the collection of the PSO Levy or payment of the PSO Payment;
(iii) for the payment of amounts in respect of the PSO Levy or collection of amounts in respect of the PSO Payment from the Board or supplier.]
(3) A document referred to in paragraphs (1) and (2) which has been approved by the Commission in accordance with paragraph (1) may, with the consent of the Commission, be modified from time to time.
(4) A document referred to in paragraphs (1) and (2) which has been approved by the Commission in accordance with paragraph (1) shall, at the request of the Commission, made in compliance with the Notification and the provisions of this Order, be modified from time to time in accordance with the request of the Commission.
Annotations
Amendments:
F81
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 11.
Editorial Notes:
E28
Previous affecting provision: sub-art. (2)(d)(iii) substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(g); sub-article substituted (20.02.2023) as per F-note above.
E29
Previous affecting provision: sub-art. (2)(a), (d)(iii) substituted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 13(a), (b); sub-article substituted (20.02.2023) as per F-note above.
Provision of information
20. It shall be the duty of each person who has duties pursuant to this Order to provide such information and documents to the Commission as it may require from time to time for the purpose of ensuring that each such person complies with his or her duties under this Order, including without limitation, information and evidence regarding amounts invoiced, received, accounted for and paid by him or her pursuant to his or her duties under this Order and the administrative expenses incurred by him or her, as appropriate in relation to the performance of his or her duties under this Order.
Transmission system operator duty of priority dispatch of generating stations
21. The Commission shall direct that the transmission system operator, where applicable give priority of dispatch to generating stations, the output of which is the subject of this Order.
F82[Public service obligation on the transmission system operator
22. There shall be imposed by the Commission on the transmission system operator a requirement to make such arrangements as are necessary to administer a competitive process, established by the Minister, to ensure that, in any specified period, there shall be available to a supplier electricity from generating stations which use as their primary fuel source renewable, sustainable or alternative forms of energy.]
Annotations
Amendments:
F82
Inserted (27.02.2020) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2020 (S.I. No. 56 of 2020), art. 2.
SCHEDULE 1
PART 1
Peat
(1) |
(2) |
(3) |
(4) |
Name of Generator |
PPA Signing Date |
PPA Termination Date |
Project Size (kW) |
Edenderry Power Limited |
19/03/98 |
21/12/15 |
117,570 |
PART 2
Peat
1. Peat powered generating stations as specified at paragraph 4.16 of the Notification to the EU Commission:
Unit in Power Plant |
Projected Closure Date |
||
Ferbane |
2000 |
||
Shannonbridge U1 |
F83[2004] |
||
Shannonbridge U2 |
2004 |
||
Shannonbridge U3 |
2004 |
||
Rhode U3 |
2003 |
||
Cahirciveen |
2003 |
||
Lanesboro U2 |
2004 |
||
Lanesboro U3 |
2004 |
||
Bellacorick U1 |
F84[2005] |
||
Bellacorick U2 |
F84[2005] |
2. New 150MW peat power generating station to be constructed at Shannonbridge County Offaly.
3. New 100MW peat power generating station to be constructed at Lanesboro, County Longford.
Annotations
Amendments:
F83
Substituted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 11.
F84
Substituted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 11.
Editorial Notes:
E30
Previous affecting provision: part 1 para. 1 amended (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 11; substituted (16.10.2021) as per F-note above.
Previous affecting provision: part 1 para. 1 amended (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 11; substituted (5.08.2005) as per E-note above.
F85[PART 3
Renewable, Sustainable or Alternative Energy
(1) |
(2) |
(3) |
(4) |
(5) |
PPA No. |
Type |
PPA Signing Date |
PPA Termination Date |
Name |
WIND |
||||
No Projects remaining in this category. |
||||
HYDRO |
||||
No Projects remaining in this category. |
||||
CHP |
||||
No Projects remaining in this category.] |
Annotations
Amendments:
F85
Substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(a).
Editorial Notes:
E31
Previous affecting provision: part 3 substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(b); substituted (11.12.2015) as per F-note above.
E32
Previous affecting provision: part 3 substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(d); substituted (19.12.2014) as per E-note above.
E33
Previous affecting provision: part 3 substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(h); substituted (25.10.2013) as per E-note above.
E34
Previous affecting provision: part 3 substituted (28.09.2011) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2011 (S.I. No. 513 of 2011), art. 2(a); substituted (31.10.2012) as per E-note above.
F86[SCHEDULE 1A
F87[…]]
Annotations
Amendments:
F86
Substituted (8.12.2016) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016), art. 3(a).
F87
Schedule deleted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(d).
Editorial Notes:
E35
Previous affecting provision: schedule substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(b); substituted (8.12.2016) as per F-note above.
E36
Previous affecting provision: schedule substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(c); substituted (11.12.2015) as per E-note above.
E37
Previous affecting provision: schedule substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(e); substituted (19.12.2014) as per E-note above.
E38
Previous affecting provision: schedule substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(i); substituted (25.10.2013) as per E-note above.
E39
Previous affecting provision: schedule substituted (28.09.2011) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2011 (S.I. No. 513 of 2011), art. 2(b); substituted (31.10.2012) as per E-note above.
E40
Previous affecting provision: ref. nos. 34, 35 inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 9; substituted (28.09.2011) as per E-note above.
E41
Previous affecting provision: schedule inserted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 9 and sch.; substituted (28.09.2011) as per E-note above.
F88[SCHEDULE 1B
RENEWABLE, SUSTAINABLE OR ALTERNATIVE ENERGY
AER VI NOTIFICATION
(1) |
(2) |
(3) |
(4) |
(5) |
Ref |
PPA No. |
Type |
PPA Signing Date |
Name |
63 |
AER6/SW36 |
Wind Power |
17/02/05 |
Cronelea Windfarm Ltd., Cronelea House, Cronelea Shillelagh, Co. Wicklow |
1 |
AER61/7/122 |
Offshore Wind Power |
ESB Customer Supply |
Arklow Energy Ltdc/o 2 The Arena Downshire Way Berkshire RG12 1PU United Kingdom] |
Annotations
Amendments:
F88
Substituted (8.12.2016) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016), art. 3(b).
Editorial Notes:
E42
Previous affecting provision: schedule substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(c); substituted (8.12.2016) as per F-note above.
E43
Previous affecting provision: schedule substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(d); substituted (11.12.2015) as per E-note above.
E44
Previous affecting provision: schedule substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(f); substituted (19.12.2014) as per E-note above.
E45
Previous affecting provision: schedule substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(j); substituted (25.10.2013) as per E-note above.
E46
Previous affecting provision: schedule substituted (28.09.2011) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2011 (S.I. No. 513 of 2011), art. 2(c); substituted (31.10.2012) as per E-note above.
E47
Previous affecting provision: part 2 substituted (3.11.2009) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2009 (S.I. No. 444 of 2009), art. 3(b); schedule substituted (28.09.2011) as per E-note above.
E48
Previous affecting provision: schedule substituted (20.07.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2005 (S.I. No. 380 of 2005), art. 5; substituted (28.09.2011) as per E-note above.
E49
Previous affecting provision: schedule inserted (21.04.2004) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004), art. 10 and sch.; substituted (20.07.2005) as per E-note above.
F89[SCHEDULE 1C
PART 1
Short-term Peaking Generation
1. Temporary generating units
(1) |
(2) |
Location |
Capacity (MW) |
Aghada, Co. Cork |
52 |
Tawnaghmore, Co. Mayo |
52 |
Rhode, Co. Offaly |
104 |
2. Contract for capacity and energy over the interconnector with Northern Ireland Electricity.
(1) |
(2) |
(3) |
Contract |
Name of Legal Counter Party |
Capacity (MW) |
VIPP Capacity and Energy Agreement dated 17 July 2003 |
Northern Ireland Electricity Plc (NIE) |
167 |
PART 2
1. New generating station at Aughinish Alumina Limited, County Limerick.
2. New generating station at Tynagh Energy Limited, County Galway.]
F90[PART 3
New Generating Capacity
(1) Name of Legal Counterparty |
(2) CADA Signing Date |
(3) Commercial Operation Date |
(4) Scheduled CADA Termination Date |
(5) Latest CADA Termination Date |
(5) Capacity (MW) |
Aughinish Alumina Ltd. Co. Limerick |
24 December 2003 |
31 March 2006 |
31 March 2016 |
31 March 2017 |
As detailed in the CADA |
Tynagh Energy Ltd., Co. Galway |
24 Decembe 2003 |
31 March 2006 |
31 March 2016 |
31 March 2017 |
As detailed in the CADA] |
Annotations
Amendments:
F89
Inserted (5.08.2005) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005), art. 12 and sch.
F90
Inserted (30.07.2007) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007), art. 11 and sch.
F91[SCHEDULE 2
PSO LEVY OR PAYMENT: INVOICING AND COLLECTION, OR PAYMENT, TERMS
1. Each supplier shall invoice the PSO Levy, or credit the PSO Payment, to each final customer to whom they make a supply of electricity in respect of each electricity account held by such final customer with that supplier on the basis of the determination made by the Commission and notified to the supplier pursuant to Article 9(3)(e).
2. Each supplier shall ensure that the PSO Levy is invoiced, or the PSO Payment is credited, to every final customer—
(a) as frequently,
(b) at the same time, and
(c) as part of the same invoice,
as charges for electricity supply are invoiced, with due regard to a supplier’s billing cycles, but in any event no less frequently than once every three months, unless otherwise directed by the Commission.
3. The amount of the PSO Levy or PSO Payment in respect of an electricity account by a final customer in a levy period or payment period, as appropriate, shall be apportioned as directed by the Commission, as far as is practicable, between the invoices to be issued by the supplier in the course of a levy period or payment period, as appropriate, but in any event so as to ensure that the full amount of the PSO Levy or PSO Payment payable by, or to, such final customer in respect of a levy period or payment period shall be so invoiced, or credited, as the case may be, within 3 months of the end of that levy period or payment period.
4. Where a final customer changes its supplier, the full monthly PSO Levy, or PSO Payment, amount for such final customer shall be invoiced, or credited, by the supplier with which that final customer is registered as the holder of an electricity account at the end of the month for which the monthly PSO Levy, or PSO Payment, is due, whether or not the final customer concerned was a customer of the said supplier for a full calendar month and each such invoice shall charge, or credit, the relevant final customer for the PSO Levy, or PSO Payment, amount due in respect of such final customer since its last PSO Levy, or PSO Payment, invoice.
5. Every invoice in respect of the PSO Levy or PSO Payment shall identify the amount of the PSO Levy, or PSO Payment, being invoiced, or credited, separately from every other item being invoiced, and shall refer to the amount as "Public Service Obligations Levy" or "Public Service Obligations Payment".
6. Every final customer invoice in respect of the PSO Levy, or PSO Payment, shall include the following description of the PSO Levy or PSO Payment:
"PUBLIC SERVICE OBLIGATIONS LEVY or PUBLIC SERVICE OBLIGATIONS PAYMENT
This public service obligations levy, and public services obligation payment, relate to the additional costs or benefits that result from the output of certain generating stations using renewable, sustainable or alternative forms of energy. These purchases are made in the interests of environmental protection, in accordance with Public Service Obligations Orders made pursuant to the Electricity Regulation Act 1999 .".
7. Each supplier shall account for, and pay to, the distribution system operator all amounts invoiced in respect of the PSO Levy from final customers connected to the distribution system, but after having deducted the expenses referred to at paragraph 15, and the amount collected from final customers shall be paid to the distribution system operator as, and on dates, determined by the Commission.
8. Each supplier shall receive from the distribution system operator amounts in respect of the PSO Payment after having added the expenses referred to at paragraph 15, under Article 12(c), such amounts and the dates of payment by the distribution system operator of such amounts, to be determined by the Commission from time to time under paragraph 7A.
9. For the purposes of Article 12(c), the distribution system operator shall make payments to suppliers, after deducting the expenses referred to at paragraph 16, of such amounts and on such dates as shall be determined by the Commission. In determining amounts payable by the distribution system operator in respect of the PSO Payment to final customers, the CRU shall have due regard to the following:
(a) the costs and expenses to be deducted under paragraph 16;
(b) the need to ensure that the distribution system operator is in funds to make such payments.
10. Each supplier shall account for, and pay to or collect from, the transmission system operator all amounts invoiced or to be credited in respect of the PSO Levy or PSO Payment from, or to, final customers connected to the transmission system but after having deducted or added, as appropriate, the expenses referred to at paragraph 15, and the amount collected from final customers shall be paid to, or the amount to be credited to final customers received from, the transmission system operator on dates to be determined by the Commission.
11. The Commission shall determine, for the purposes of this Order, whether any category of final customer is considered to be connected to the distribution system or the transmission system.
12. The distribution system operator shall account for, and pay to, the transmission system operator all amounts received by it from suppliers pursuant to paragraph 7, but after having deducted the expenses referred to at paragraph 16, and the amount collected shall be paid to the transmission system operator as, and on dates, determined by the Commission.
13. The distribution system operator shall receive from the transmission system operator all amounts in respect of the PSO Payment to be credited by suppliers to final customers connected to the distribution system, pursuant to paragraph 12, after having added the expenses referred to at paragraph 16, as, and on dates, to be determined by the Commission.
14. The transmission system operator shall account for, and pay to or collect from, the Board and relevant suppliers all amounts received by it from, suppliers and the distribution system operator pursuant to paragraphs 10 and 12 but after having deducted or added, as appropriate, the expenses referred to at paragraph 17, and the amount collected or to be paid shall be paid to the Board on dates determined by the Commission.
15. Each supplier shall be entitled to deduct from, or add to, as appropriate, the amounts to be paid to, or received from, the distribution system operator and the transmission system operator, as the case may be, pursuant to paragraph 7, 8 or 10, an amount equal to the administrative expenses estimated or determined by the Commission as incurred in complying with its duties as—
(a) a collector of the PSO levy, and
(b) a creditor of the PSO Payment,
under this Order, and the amounts so deducted, or added, shall form part of the calculation of the PSO Levy, or PSO Payment, specified in Article 8(1).
16. The distribution system operator shall be entitled to deduct from, or add to, as appropriate, the amount to be paid to, or received from, the transmission system operator pursuant to paragraph 12 or 13, an amount equal to the administrative expenses estimated or determined by the Commission as incurred in complying with its duties as—
(a) a collector of the PSO Levy, and
(b) a creditor of the PSO Payment,
under this Order, and the amounts so deducted, or added, shall form part of the calculation of the PSO Levy, or PSO Payment, specified in Article 8(1).
17. The transmission system operator shall be entitled to deduct from, or add to, as appropriate, the amounts to be paid to, or collected from, the Board and relevant suppliers, as the case may be, pursuant to paragraph 10 or 14, an amount equal to its administrative expenses estimated or determined by the Commission as incurred in complying with its duties as—
(a) a collector of the PSO Levy, and
(b) a creditor of the PSO Payment,
under this Order, and the amounts so deducted, or added, shall form part of the calculation of the PSO Levy, or PSO Payment, specified in Article 8(1).
18. Where a supplier has paid to the distribution system operator or the transmission system operator, as the case may be, an amount in respect of the PSO Levy invoiced to a final customer and the supplier has not received payment of that amount or a part of that amount from the final customer, if the supplier satisfies the Commission that all necessary steps have been taken to recover such amount and that the amount is nonetheless irrecoverable or unlikely to ever be recovered by the supplier, the Commission shall issue a certificate to that effect and the supplier shall thereupon be entitled to treat the amount concerned as an administrative expense referred to in Article 9.
19. Where a supplier, the distribution system operator or the transmission system operator has instituted legal proceedings to recover monies which it is entitled to recover and which include the PSO Levy, or PSO Payment, and
(a) those monies are recovered, wholly or partly, or
(b) the monies, or a part of them, are adjudged by a court of competent jurisdiction to be due and owing to the person who instituted the proceedings,
then the legal costs (assessed on a solicitor and client basis) incurred by the person instituting those proceedings shall be treated as an administrative expense of that person in the same proportion that the PSO Levy, or PSO Payment, bears to the sum recovered or adjudged to be due to the extent that the legal costs are not otherwise recovered.
20. Where the amount of an invoice relating to the supply of electricity is partly paid by a final customer, the PSO Levy or PSO Payment, as the case may be, shall be treated as partly paid in the same proportion as the payment bears to the total amount of the invoice (excluding Value-Added Tax).]
Annotations
Amendments:
F91
Substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 12 and sch. 1.
Editorial Notes:
E50
Previous affecting provision: schedule purported to be substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(c); substituted (20.02.2023) as per F-note above. Note apparent typo in art. 3(c) substituting sch. 2, not sch. 5. Note also reference to previous amendment by Order of 2020, art. 3(b), which appears to refer to S.I. No. 500 of 2020, art. 3(b). See at Sch. 5 below.
E51
Previous affecting provision: para. 6-8 substituted (19.12.2002) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002), art. 11(a), (b), (c); substituted (20.02.2023) as per F-note above.
F92[SCHEDULE 3
Article 3
In this Schedule—
"biomass" means the biodegradable fraction of products, waste and residues from biological origin from agriculture (including vegetal and animal substances), forestry and related industries including fisheries and aquaculture, as well as the biodegradable fraction of industrial and municipal waste;
"CHP" means combined heat and power;
"hydro project" means any hydro-powered electricity generating plant with a maximum export capacity of or less than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant;
"LFG" means landfill gas;
"large scale wind project" means an onshore wind project with a maximum export capacity greater than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant;
"small scale wind project" means any wind-powered electricity generating plant with a maximum export capacity of or less which is connected directly to the electricity network and metered independently of any other electricity generating plant.
(1) Ref. No. |
(2) REFIT Power Purchase Agreement Reference |
(3) Supplier |
(4) Electricity generator |
(5) Generation plant Description |
(6) Energy source of electricity |
(7) Capacity Accepted into REFIT (MW) |
1 |
1/5/2 |
Energia Customer Solutions Ltd. |
Reirk Energy Ltd. |
Dromdeeveen Ballagh Co. Limerick |
Large Scale Wind Project |
10.500 |
2 |
1/5/4 |
Bord Gáis Energy Ltd. |
Adeery Hydro |
Killybegs Co. Donegal |
Hydro Project |
0.400 |
3 |
1/5/5 |
Energia Customer Solutions Ltd. |
Bawnmore Windfarm Ltd. |
Carriganima Macroom Co. Cork |
Large Scale Wind Project |
14.990 |
4 |
1/5/6 |
Energia Customer Solutions Ltd. |
Muingnaminnane Windfarms Ltd. |
Muingnaminnane Kielduff Tralee Co. Kerry |
Large Scale Wind Project |
15.300 |
5 |
1/5/9 |
Energia Customer Solutions Ltd. |
Tra Investments Ltd. |
Ballincollig Hill & Maghanknockane Tralee Co. Kerry |
Large Scale Wind Project |
13.300 |
6 |
1/5/26 |
Energia Customer Solutions Ltd. |
Corkermore Windfarm Ltd. |
Corkermore Windfarm Corkermore Killybegs Co. Donegal |
Large Scale Wind Project |
9.990 |
7 |
1/5/30 |
Energia Customer Solutions Ltd. |
Knocknalour Wind Farm Ltd. |
Knocknalour Bunclody Enniscorthy Co. Wexford |
Small Scale Wind Project |
4.600 |
8 |
1/5/32 |
Gael Force Power Ltd. |
Gairdini |
Lacka Cross Ballydesmond Co. Cork |
Biomass CHP |
2.900 |
9 |
1/5/38 |
Energia Customer Solutions Ltd. |
Carrigcannon Wind Farm Ltd. |
Carragraigue Rathcoole Mallow Co. Cork |
Large Scale Wind Project |
20.000 |
10 |
1/5/54 |
SSE Airtricity Ltd. |
Limerick West Windfarm Ltd. |
Rathcahill West Tournafulla Co. Limerick |
Large Scale Wind Project |
12.500 |
11 |
1/5/57 |
SSE Airtricity Ltd. |
Green Energy Company Ltd. |
Meentycat Cark Co. Donegal |
Large Scale Wind Project |
14.000 |
12 |
1/5/69 |
Energia Customer Solutions Ltd. |
Holyford Windfarm Ltd. |
Hollyford Windfarm Glenough Upper Hollyford Co. Tipperary |
Large Scale Wind Project |
9.000 |
13 |
1/5/70 |
SSE Airtricity Ltd. |
Redwind Energy Phase 3 Ltd. |
Meenagrauv Ballybofey Stranorlar Co. Donegal |
Small Scale Wind Project |
3.600 |
14 |
1/5/78 |
Bord Gáis Energy Ltd. |
Derrynadivva Windfarm Ltd. |
Derrynadivva Doogry & Lenanavea Castlebar Co. Mayo |
Large Scale Wind Project |
8.500 |
15 |
1/5/79 |
Bord Gáis Energy Ltd. |
Templederry Windfarm Ltd. |
Templederry Windfarm Knockmeale Boherlody & Lisgarriff Dolla Nenagh Co. Tipperary |
Small Scale Wind Project |
4.600 |
16 |
1/5/82 |
Slievereagh (CS) Ltd. |
Slievereagh Power Ltd. |
Slievereagh Windfarm Kilfinane Co. Limerick |
Small Scale Wind Project |
3.100 |
17 |
1/5/86 |
Energia Customer Solutions Ltd. |
Gortahile Windfarm Ltd. |
Gortahile Windfarm Ardough Co. Laois |
Large Scale Wind Project |
21.000 |
18 |
1/5/87 |
Energia Customer Solutions Ltd. |
Glenough Windfarm Ltd. |
Glenough Windfarm Glenough Co. Tipperary |
Large Scale Wind Project |
33.000 |
19 |
1/5/91 |
ESB |
Hibernian Windpower Ltd. |
Tullynahaw Windfarm Arigna Co. Roscommon |
Large Scale Wind Project |
26.675 |
20 |
1/5/93 |
Energia Customer Solutions Ltd. |
Powercon Wind Energy Ltd. |
Carrowleagh Windfarm Carrowleagh Bonniconlon Co. Mayo |
Large Scale Wind Project |
34.150 |
21 |
1/5/94 |
Energia Customer Solutions Ltd. |
West Clare Windfarm (Services) Ltd. |
Seltannaveeny Windfarm Seltannaveeny Arigna Co. Roscommon |
Small Scale Wind Project |
4.600 |
22 |
1/5/96 |
Bord Gáis Energy Ltd. |
Sunflower Design Ltd. |
Mace Upper Windfarm Claremorris Co. Mayo |
Small Scale Wind Project |
2.400 |
23 |
1/5/98 |
SWS Green Energy Ltd. |
Garracummer Windfarm Ltd. |
Garracummer Moanvaun Reisk Tooreen & Falleenafinnooga Hollyford Co. Tipperary |
Large Scale Wind Project |
36.900 |
24 |
1/5/99 |
SSE Airtricity Ltd. |
Western Power Ltd. |
Lenanavea Castlebar Co. Mayo |
Small Scale Wind Project |
4.500 |
25 |
1/5/100 |
SWS Green Energy Ltd. |
Ballymartin Windfarm Ltd. |
Ballymartin Windfarm Ballymartin Brabstown Co. Kilkenny |
Large Scale Wind Project |
6.000 |
26 |
1/5/103 |
Indaver Energy Ltd. |
Indaver Ireland Ltd. |
Carranstown Duleek Co. Meath |
Biomass |
15.180* |
27 |
1/5/105 |
ESB |
Hibernian Windpower Ltd. |
Grouselodge Windfarm Ardagh Co. Limerick |
Large Scale Wind Project |
15.000 |
28 |
1/5/106 |
Energia Customer Solutions Ltd. |
Caherciveen Wind Ltd. |
Caherciveen Windfarm Knockaneden Caherciveen Co. Kerry |
Large Scale Wind Project |
9.000 |
29 |
1/5/113 |
Energia Customer Solutions Ltd. |
Bawnmore Windfarm Ltd. |
Cahernafulla Coachford Co. Cork |
Large Scale Wind Project |
9.000 |
30 |
1/5/119 |
Energia Customer Solutions Ltd. |
Ballynancoran Wind Farm Ltd. |
Ballynancoran Windfarm Ballynancoran Donishal Ferns Co. Wexford |
Small Scale Wind Project |
4.000 |
31 |
1/5/121 |
SSE Airtricity Ltd. |
Carrons Windfarm Ltd. |
Carrons Windfarm Dunmoylan Shanagolden Co. Limerick |
Small Scale Wind Project |
5.000 |
32 |
1/5/122 |
Gael Force Power Ltd. |
W.E.D. Cross Energy Ltd. |
WED Cross Windfarm Lacka Cross Ballydesmond Co. Cork |
Small Scale Wind Project |
4.000 |
33 |
1/5/128 |
Energia Customer Solutions Ltd. |
Shannagh Wind Farm Ltd. |
Kilcar Windfarm Shannagh Kilcar Co. Donegal |
Small Scale Wind Project |
2.550 |
34 |
1/5/129 |
Bord Gáis Energy Ltd. |
Menard Ltd. |
Skrine Windfarm Athleague Co. Roscommon |
Small Scale Wind Project |
4.600 |
35 |
1/5/130 |
Bord Gáis Energy Ltd. |
Fairbourne Commercial Ltd. |
Leabeg Windfarm Ferbane Co. Offaly |
Small Scale Wind Project |
4.250 |
36 |
1/5/133 |
Energia Customer Solutions Ltd. |
I.Q.Wind Ltd. |
Crocane Windfarm Crocane Cloyne Midleton Co. Cork |
Small Scale Wind Project |
1.700 |
37 |
1/5/134 |
Energia Customer Solutions Ltd. |
Pluckanes Windfarm Ltd. |
Pluckanes Donoughmore Co. Cork |
Small Scale Wind Project |
0.850 |
38 |
1/5/137 |
Energia Customer Solutions Ltd. |
Caher Downey Wind Farm Ltd. |
Caherdowney Windfarm Caherdowney Carriganimma Macroom Co. Cork |
Large Scale Wind Project |
10.000 |
39 |
1/5/139 |
Energia Customer Solutions Ltd. |
Venti Windfarm Energy Ltd. |
Curraghgraigue 2 Windfarm Curraghgraigue Upper Templederry Nenagh Co. Tipperary |
Small Scale Wind Project |
2.440 |
40 |
1/5/146 |
Energia Customer Solutions Ltd. |
Reirk Energy Ltd. |
Dromdeeveen Windfarm Ballagh Co. Limerick |
Large Scale Wind Project |
16.500 |
41 |
1/5/147 |
Energia Customer Solutions Ltd. |
Clydaghroe Windfarm Ltd. |
Clydaghroe Windfarm Cummeennabuddoge Clonkeen Co. Kerry |
Small Scale Wind Project |
5.000 |
42 |
1/5/150 |
SSE Airtricity Ltd. |
Brickmount Ltd. |
Dunneill Windfarm Ballyglass Co. Sligo |
Large Scale Wind Project |
11.050 |
43 |
1/5/153 |
SSE Airtricity Ltd. |
Dromada Windfarm (ROI) Ltd. |
Dromada Windfarm Clash South Athea Co. Limerick |
Large Scale Wind Project |
28.500 |
44 |
1/5/154 |
Energia Customer Solutions Ltd. |
Tullynamoyle Windfarm Ltd |
Tullynamoyle Windfarm Tullynamoyle Killarga Co. Leitrim |
Large Scale Wind Project |
9.000 |
45 |
1/5/155 |
Energia Customer Solutions Ltd. |
Ballaman Windfarm Ltd. |
Ballaman & Moneydurtlow Tombrack Ferns Co. Wexford |
Small Scale Wind Project |
3.600 |
46 |
1/5/163 |
Bord Gáis Energy Ltd. |
Sigatoka Ltd. |
Garranereagh Windfarm Lissarda Co. Cork |
Large Scale Wind Project |
8.750 |
47 |
1/5/166 |
Bord Gáis Energy Ltd. |
Cuillalea Windfarm Ltd. |
Cuillalea Windfarm Extension Treannaglearagh Kiltimagh Co. Mayo |
Small Scale Wind Project |
1.700 |
48 |
1/5/167 |
Statkraft Markets GmbH |
Castledockrell Windgroup Ltd. |
Castledockrell Windfarm Ballenahillan Ballycarney Enniscorthy Co. Wexford |
Large Scale Wind Project |
41.400 |
49 |
1/5/173 |
SSE Airtricity Ltd. |
Starrus LFG Ltd. Greenstar Gas Energy (Meath) Ltd. |
Knockharley Landfill Site Kentstown Co. Meath |
Biomass LFG |
1.500 |
50 |
1/5/174 |
ESB |
Garvagh Glebe Power Ltd. |
Garvagh Glebe Windfarm Co. Leitrim |
Large Scale Wind Project |
31.525 |
51 |
1/5/177 |
SWS Green Energy Ltd. |
BW2 Wind Farm Ltd. |
Booltiagh Windfarm Extension Booltiagh Connolly Co. Clare |
Large Scale Wind Project |
12.000 |
52 |
1/5/179 |
Energia Customer Solutions Ltd. |
Windfarm Management Ltd. |
Drumlough Hill Windfarm Extension Drumlough Hill Buncrana Co. Donegal |
Large Scale Wind Project |
10.200 |
53 |
1/5/182 |
Energia Customer Solutions Ltd. |
Arthur Davidson |
Aghadullagh Mill Lismentan Ballintra Co. Donegal |
Hydro Project |
0.140 |
54 |
1/5/183 |
Flogas Enterprise Solutions Ltd. |
Starrus LFG Ltd. |
Ballynagran Residual Landfill (Phase 1) Ballynagran Co. Wicklow |
Biomass LFG |
0.750 |
55 |
1/5/184 |
Flogas Enterprise Solutions Ltd. |
Starrus LFG Ltd. |
Connaught Regional Residual Landfill Kilconnell Co. Galway |
Biomass LFG |
0.660 |
56 |
1/5/185 |
SWS Green Energy Ltd. |
Lisheen Wind Farm II Ltd. |
Lisheen Windfarm II Lisheen Mine Killoran Moyne Thurles Co. Tipperary |
Large Scale Wind Project |
24.000 |
57 |
1/5/186 |
Energia Customer Solutions Ltd. |
Ballycadden Windfarm Ltd. |
Ballycadden Bolinrush Lackendarragh Bunclody Co. Wexford |
Large Scale Wind Project |
14.450 |
58 |
1/5/187 |
SSE Airtricity Ltd. |
March Winds Ltd. |
Athea Co. Limerick |
Large Scale Wind Project |
38.200 |
59 |
1/5/189 |
Burren Energy Supply Ltd. |
Knocknagoum Windfarm Ltd. |
Knocknagoum Windfarm Lyrecrompane Listowel Co. Kerry |
Large Scale Wind Project |
41.300 |
60 |
1/5/190 |
SWS Green Energy Ltd. |
Knockacummer Wind Farm Ltd. |
Knockacummer Co. Cork |
Large Scale Wind Project |
100.000 |
*Note that this plant will have a variable biodegradable fuel content, affecting the proportion of its exported electricity eligible for REFIT. This will be estimated ex-ante and will be certified for the purposes of REFIT calculations on an ex-post basis]
Annotations
Amendments:
F92
Substituted (19.12.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024), art. 3 and sch. 1.
Editorial Notes:
E52
Previous affecting provision: schedule substituted (25.07.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 1) Order 2024 (S.I. No. 377 of 2024), art. 3 and sch. 1; substituted (19.12.2024) as per F-note above.
E53
Previous affecting provision: schedule substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 13 and sch. 2; substituted (25.07.2024) as per E-note above.
E54
Previous affecting provision: schedule substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(a); substituted (20.02.2023) as per E-note above. Note apparent typo in art. 3(a) substituting sch. 1, not sch. 3. Note also reference to previous amendment by Order of 2019, art. 3(b), which appears to refer to S.I. No. 497 of 2019, art. 3(a).
E55
Previous affecting provision: schedule substituted (29.09.2019) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2019 (S.I. No. 497 of 2019), art. 3(a) and sch. 1; substituted (16.10.2021) as per E-note above.
E56
Previous affecting provision: schedule substituted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(e) and sch. 1; substituted (29.09.2019) as per E-note above.
E57
Previous affecting provision: schedule substituted (8.12.2016) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016), art. 3(c) and sch.; substituted (27.09.2018) as per E-note above.
E58
Previous affecting provision: schedule substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(d); substituted (8.12.2016) as per E-note above.
E59
Previous affecting provision: schedule substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(e); substituted (11.12.2015) as per E-note above.
E60
Previous affecting provision: schedule substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(g); substituted (19.12.2014) as per E-note above.
E61
Previous affecting provision: schedule substituted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(k); substituted (25.10.2013) as per E-note above.
E62
Previous affecting provision: schedule substituted (28.09.2011) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2011 (S.I. No. 513 of 2011), art. 2(d); substituted (31.10.2012) as per E-note above.
E63
Previous affecting provision: schedule substituted (3.11.2010) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2010 (S.I. No. 532 of 2010), art. 3b and sch.; substituted (28.09.2011) as per E-note above.
E64
Previous affecting provision: schedule substituted (3.11.2009) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2009 (S.I. No. 444 of 2009), art. 3(c); substituted (3.11.2010) as per E-note above.
E65
Previous affecting provision: schedule inserted (18.07.2008) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008), art. 14 and sch.; substituted (3.11.2009) as per E-note above.
F93[SCHEDULE 4
In this Schedule—
"biomass" means the biodegradable fraction of products, waste and residues from biological origin from agriculture (including vegetal and animal substances), forestry and related industries including fisheries and aquaculture, as well as the biodegradable fraction of industrial and municipal waste;
"hydro project" means any hydro-powered electricity generating plant with a maximum export capacity of or less than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant;
"LFG" means landfill gas;
"large scale wind project" means an onshore wind-powered electricity generating plant with a maximum export capacity greater than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant;
"small scale wind project" means an onshore wind-powered electricity generating plant with a maximum export capacity of 5 MW or less which is connected directly to the electricity network and metered independently of any other electricity generating plant.
(1) Ref. No. |
(2) REFIT Power Purchase Agreement Reference |
(3) Supplier |
(4) Electricity generator |
(5) Generation plant Description |
(6) Energy source of electricity |
(7) Capacity Accepted into REFIT (MW) |
1 |
1/2/1 |
Meenacloghspar (Wind) Supply Ltd. |
Meenacloghspar (Wind) Ltd. |
Ballyduff Windfarm Kilcomb Camolin Co. Wexford |
Small Scale Wind Project |
4.600 |
2 |
1/2/3 |
Slievereagh Power (CS) Ltd. |
Slievereagh Power Ltd. |
Slievereagh Windfarm Phase 2 Glenaree Kilfinane Co. Limerick |
Small Scale Wind Project |
2.300 |
3 |
1/2/4 |
Glanaruddery Energy Supply Ltd. |
Glanaruddery Windfarms Ltd. |
Dromadda More Windfarm 2 Dromadda More Knocknagoshel Co. Kerry |
Large Scale Wind Project |
12.000 |
4 |
1/2/5 |
Oak Energy Supply Ltd. |
Cordal Windfarms Ltd. |
Cordal Windfarm Cordal Co. Kerry |
Large Scale Wind Project |
35.200 |
5 |
1/2/6 |
Glanaruddery Energy Supply Ltd. |
Glanaruddery Windfarms Ltd. |
Dromadda More Windfarm 2 Dromadda More Knocknagoshel Co. Kerry |
Large Scale Wind Project |
20.000 |
6 |
1/2/7 |
Oak Energy Supply Ltd. |
Cordal Windfarms Ltd. |
Cordal 2 Windfarm Cordal Co. Kerry |
Large Scale Wind Project |
54.000 |
7 |
1/2/9 |
Energia Customer Solutions Ltd. |
Ballycadden Windfarm Ltd. |
Ballycadden Windfarm Phase 2 Ballycadden Bunclody Co. Wexford |
Large Scale Wind Project |
9.200 |
8 |
1/2/10 |
Energia Customer Solutions Ltd. |
Wexwind Ltd. |
Gibbet Hill Windfarm Graiguemore, Bolinahaney & Kiltilly Kilrush Bunclody Co. Wexford |
Large Scale Wind Project |
14.800 |
9 |
1/2/11 |
SWS Green Energy Ltd. |
Smithstown Windfarm Ltd. |
Smithstown Windfarm Smithstown Mullinavat Co. Kilkenny |
Large Scale Wind Project |
8.200 |
10 |
1/2/12 |
Flogas Enterprise Solutions Ltd. |
Starrus LFG Ltd. |
Knockharley Landfill (Phase 2) Knockharley Kentstown Co. Meath |
Biomass LFG |
2.700 |
11 |
1/2/13 |
Flogas Enterprise Solutions Ltd. |
Starrus LFG Ltd. |
Ballynagran Residual Landfill (Phase 2) Ballynagran Co. Wicklow |
Biomass LFG |
3.450 |
12 |
1/2/14 |
Flogas Enterprise Solutions Ltd. |
Emgen Power Ltd. |
Corranure Landfill Corranure Co. Cavan |
Biomass LFG |
0.735 |
13 |
1/2/17 |
Bord Gáis Energy Ltd. |
Acres Energy Ltd. |
Acres Windfarm Spaddan Ballyshannon Co. Donegal |
Large Scale Wind Project |
17.500 |
14 |
1/2/19 |
Templederry Renewable Energy Supply Ltd. |
Stradbally Hall Promotions Ltd. |
Stradbally Hall Stradbally Co. Laois |
Hydro Project |
0.028 |
15 |
1/2/20 |
Flogas Enterprise Solutions Ltd. |
Gas Ruddy – ALT Turbines Co. Ltd. |
Bunnahowen Ballina Road Co. Mayo |
Small Scale Wind Project |
2.550 |
16 |
1/2/21 |
SWS Green Energy Ltd. |
Kill Hills Windfarm |
Kill Hills Windfarm Dualla Cashel Co. Tipperary |
Large Scale Wind Project |
36.800 |
17 |
1/2/22 |
Bord Gáis Energy Ltd. |
Monaincha Wind Farm Ltd. |
Monaincha Roscrea Co. Tipperary |
Large Scale Wind Project |
36.000 |
18 |
1/2/23 |
Flogas Enterprise Solutions Ltd. |
Carrownaweelaun Energy Ltd. |
Carrownaweelaun Windfarm Carrownaweelaun Kilkee Co. Clare |
Small Scale Wind Project |
4.600 |
19 |
1/2/24 |
Energia Customer Solutions Ltd. |
Rathnameneenagh Energy Ltd. |
Ballycurreen Windfarm Rathnameneenagh Ballycurreen Ring Co. Waterford |
Small Scale Wind Project |
4.990 |
20 |
1/2/25 |
Burren Energy Supply Ltd. |
Knocknagoum Windfarm Ltd. |
Knocknagoum Windfarm Lyrecrompane Listowel Co. Kerry |
Small Scale Wind Project |
1.800 |
21 |
1/2/27 |
Flogas Enterprise Solutions Ltd. |
Knocknalour Wind Farm Ltd. |
Knocknalour Windfarm Phase 2 Knocknalour Bunclody Co. Wexford |
Small Scale Wind Project |
4.350 |
22 |
1/2/30 |
Flogas Enterprise Solutions Ltd. |
Louth County Council |
Whiteriver Landfill Site Dunleer Co. Louth |
Biomass LFG |
1.274 |
23 |
1/2/31 |
Templederry Renewable Energy Supply Ltd. |
Athgarvan Grain Company Ltd. |
Athgarvan Mill Newbridge Co. Kildare |
Hydro Project |
0.040 |
24 |
1/2/35 |
Energia Customer Solutions Ltd. |
Faughary Wind Farm Ltd. |
Faughary Manorhamilton Co. Leitrim |
Large Scale Wind Project |
6.000 |
25 |
1/2/36 |
ESB |
Woodhouse Windfarm Ltd. |
Woodhouse Windfarm Aglish Dungarvan Co. Waterford |
Large Scale Wind Project |
23.280 |
26 |
1/2/37 |
Templederry Renewable Energy Supply Ltd. |
Salvaged Energy Ltd. T/A Alan Maharaj |
The Old Woollen Mill Bleach Road Kilkenny |
Hydro Project |
0.150 |
27 |
1/2/38 |
Flogas Enterprise Solutions Ltd. |
Carrickeeny Wind Ltd. |
Carrickeeny Windfarm Manorhamilton Co. Leitrim |
Large Scale Wind Project |
7.650 |
28 |
1/2/39 |
Meitheal na Gaoithe Energy Supply Ltd. |
Gortnahalla Wind Farm Ltd. |
Gortnahalla Windfarm Upperchurch Co. Tipperary |
Small Scale Wind Project |
0.499 |
29 |
1/2/40 |
Templederry Renewable Energy Supply Ltd. |
South Tipperary County Council |
M8 Junction 10 Cloghabreedy Cahir Co. Tipperary |
Small Scale Wind Project |
0.006 |
30 |
1/2/41 |
LGLP Energy Supply Ltd. |
Coir na Gaoithe Teoranta |
Lettergunnet Spiddal Co. Galway |
Large Scale Wind Project |
40.900 |
31 |
1/2/42 |
Mount Lucas Supply Company Ltd. |
Mount Lucas Wind Farm Ltd. |
Mount Lucas Daingean Co. Offaly |
Large Scale Wind Project |
79.200 |
32 |
1/2/43 |
Bruckana Supply Company Ltd. |
Bruckana Wind Farm Ltd. |
Bruckana Windfarm Bruckana Templetuohy Co. Tipperary |
Large Scale Wind Project |
39.600 |
33 |
1/2/44 |
Flogas Enterprise Solutions Ltd. |
Bord na Móna Environmental Ltd. |
Killinagh Upper Carbury Co. Kildare |
Biomass LFG |
5.000 |
34 |
1/2/46 |
Bord Gáis Energy Ltd. |
Barranafaddock Sustainable Electricity Ltd. |
Barranafaddock Windfarm Barranafaddock Ballyduff Co. Waterford |
Large Scale Wind Project |
32.400 |
35 |
1/2/47 |
Energia Customer Solutions Ltd. |
Windgeneration Ireland Ltd. |
Meenadreen Windfarm Meenadreen Co. Donegal |
Large Scale Wind Project |
89.850 |
36 |
1/2/49 |
ElectroRoute Energy Supply Ltd. |
Knocknagashel Wind Farm Ltd. |
Cloghboola Windfarm Knocknagashel Co. Kerry |
Large Scale Wind Project |
46.000 |
37 |
1/2/50 |
ElectroRoute Energy Supply Ltd. |
Ballybay Wind Farm Ltd. |
Ballybeagh Windfarm Ballybeagh Tullaroan Co. Kilkenny |
Large Scale Wind Project |
13.800 |
38 |
1/2/51 |
Beal na mBlath Power Trading Ltd. |
Foyle Windfarm Ltd. |
Holmes Hill Windfarm Foylatalure Tullaroan Co. Kilkenny |
Large Scale Wind Project |
9.600 |
39 |
1/2/52 |
Flogas Enterprise Solutions Ltd. |
Devine & Associates Derrinumera Ltd. |
Derrinumera Landfill Newport Co. Mayo |
Biomass LFG |
0.380 |
40 |
1/2/53 |
Cnoc Energy Supply Ltd. |
Cnoc Windfarms Ltd. |
Bawnlea Grange Barna Thurles Co. Tipperary |
Large Scale Wind Project |
11.500 |
41 |
1/2/56 |
Energia Customer Solutions Ltd. |
Ballybane Windfarms Ltd. |
Glanta Commons Windfarm Extension Phase 2A Lognagappul Barryroe & Dromdourneen Bantry Co. Cork |
Large Scale Wind Project |
13.050 |
42 |
1/2/58 |
Bord Gáis Energy Ltd. |
Ballagh Windfarm Ltd. |
Ballagh Windfarm Ballagh Ashford Co. Wicklow |
Small Scale Wind Project |
4.600 |
43 |
1/2/59 |
Lantanier Ltd. |
Janssen Biologics (Ireland) |
Janssen Biologics (Ireland) Barnahely Ringaskiddy Co. Cork |
Small Scale Wind Project |
2.000 |
44 |
1/2/60 |
Lantanier Ltd. |
DePuy (Ireland) |
Loughbeg Industrial Estate Ringaskiddy Co. Cork |
Small Scale Wind Project |
2.500 |
45 |
1/2/61 |
Flogas Enterprise Solutions Ltd. |
Connaught Power Ltd. |
Cloonlusk Tuam Co. Galway |
Small Scale Wind Project |
4.250 |
46 |
1/2/62 |
Flogas Enterprise Solutions Ltd. |
Kilmeedy Windfarm Ltd. |
Kilmeedy Windfarm Ballinruan Kilmeedy Co. Limerick |
Small Scale Wind Project |
4.999 |
47 |
1/2/63 |
Dunmore Power Supply Ltd. |
Collon Wind Power Ltd. |
Collon Windfarm Leaby Cross Collon Co. Louth |
Small Scale Wind Project |
3.000 |
48 |
1/2/65 |
Flogas Enterprise Solutions Ltd. |
Cork City Council T/A KRLF Power |
Kinsale Road Landfill Site Tramore Valley Road Cork City |
Biomass LFG |
0.500 |
49 |
1/2/66 |
Flogas Enterprise Solutions Ltd. |
Regan Wind Ltd. |
Crockbrack Wind Farm Moville Co. Donegal |
Small Scale Wind Project |
4.000 |
50 |
1/2/68 |
Flogas Enterprise Solutions Ltd. |
Kilbranish Wind Farm Ltd. |
Kilbranish Windfarm Bunclody Co. Carlow |
Small Scale Wind Project |
2.500 |
51 |
1/2/69 |
Flogas Enterprise Solutions Ltd. |
Portfinch Ltd. |
Beale Hill 3 Windfarm Beale Hill Ballybunion Co. Kerry |
Small Scale Wind Project |
1.300 |
52 |
1/2/70 |
Bord Gáis Energy Ltd. |
Gallia Commercial Ltd. |
Roosky Windfarm Roosky Ballaghadereen Co. Roscommon |
Small Scale Wind Project |
3.600 |
53 |
1/2/73 |
Energia Customer Solutions Ltd. |
Windgeneration Ireland Ltd. |
Meenadreen Windfarm Meenadreen Laghey Co. Donegal |
Large Scale Wind Project |
5.400 |
54 |
1/2/74 |
Bord Gáis Energy Ltd. |
Scart Energy Ltd. |
Scartaglen Windfarm Barna Scartaglen Co. Kerry |
Large Scale Wind Project |
39.250 |
55 |
1/2/76 |
DWL Energy Supply Ltd. |
Green Energy Supply Ltd. |
Boggeragh (2) Windfarm Boggeragh Mountains Co. Cork |
Large Scale Wind Project |
65.000 |
56 |
1/2/78 |
ElectroRoute Energy Supply Ltd. |
Killala Community Wind Farm DAC |
Killala Co. Mayo |
Large Scale Wind Project |
19.200 |
57 |
1/2/79 |
SSE Airtricity Ltd. |
Comhlacht Gaoithe Teoranta |
Cloosh Valley Roscahill Co. Galway (Uggool & Lettercraffroe Windfarms) |
Large Scale Wind Project |
64.000 |
58 |
1/2/80 |
SSE Airtricity Ltd. |
Cloosh Valley Wind Farm DAC |
Cloosh Valley Rosscahill Co. Galway |
Large Scale Wind Project |
105.000 |
59 |
1/2/81 |
SWS Green Energy Ltd. |
Ballyhoura Wind Ltd. |
Buttevant Wind Farm Streamhill East & West Doneraile Co. Cork |
Large Scale Wind Project |
18.300 |
60 |
1/2/82 |
ESB |
Raheenleagh Power Ltd. |
Raheenleagh Windfarm Raheenleagh Croghan Mountain Co. Wicklow |
Large Scale Wind Project |
35.200 |
61 |
1/2/83 |
Flogas Enterprise Solutions Ltd. |
Lisdowney Wind Farm Ltd. |
Lisdowney Ballyragget Co. Kilkenny |
Large Scale Wind Project |
9.200 |
62 |
1/2/84 |
SSE Airtricity Ltd. |
Gweedore Wind Farm Ltd. |
Cronalacht Mountain Gweedore Co. Donegal |
Large Scale Wind Project |
16.960 |
63 |
1/2/87 |
Flogas Enterprise Solutions Ltd. |
Raragh Developments Ltd. |
Raragh Windfarm Raragh Kingscourt Co. Cavan |
Large Scale Wind Project |
11.500 |
64 |
1/2/88 |
Flogas Enterprise Solutions Ltd. |
Tullabrack Energy Ltd. |
Tullabrack Windfarm Tullabrack Kilkee Co. Clare |
Large Scale Wind Project |
13.800 |
65 |
1/2/89 |
ElectroRoute Energy Supply Ltd. |
Glencarbry Windfarm Ltd. |
Glencarbry Windfarm Glencarbry Hollyford Co. Tipperary |
Large Scale Wind Project |
33.000 |
66 |
1/2/90 |
Energia Customer Solutions Ltd. |
Killin Hill Windfarm Ltd. |
Killin Hill Co. Donegal |
Large Scale Wind Project |
6.000 |
67 |
1/2/93 |
Bord Gáis Energy Ltd. |
Oldmill Wind Ltd. |
Carrickatee Co. Monaghan |
Large Scale Wind Project |
16.100 |
68 |
1/2/94 |
Pallas Energy Supply Ltd. |
Pallas Wind Farm Ltd. |
Pallas Windfarm Extension Banemore Listowel Co. Kerry |
Large Scale Wind Project |
13.800 |
69 |
1/2/96 |
Statkraft Markets GmbH |
Wind Power Consultants Ltd. |
Carhooearagh Moyvane Co. Kerry |
Small Scale Wind Project |
0.499 |
70 |
1/2/97 |
Microsoft Ireland Energy Ltd. |
Ronaver Energy Ltd. |
Tullahennel / Larha Ballylongford Co. Kerry |
Large Scale Wind Project |
37.000 |
71 |
1/2/98 |
Flogas Enterprise Solutions Ltd. |
Gortnacloghy Wind Farm Ltd. |
Gortnacloghy Windfarm Newcastle West Co. Limerick |
Small Scale Wind Project |
4.400 |
72 |
1/2/100 |
Flogas Enterprise Solutions Ltd. |
Liffey Energy Ltd. |
Ballyjamesduff Co. Cavan |
Small Scale Wind Project |
3.017 |
73 |
1/2/102 |
Derrysallagh Supply Ltd. Energia Customer Solutions Ltd. |
Derrysallagh Windfarm Ltd. |
Derrysallagh Co. Sligo |
Large Scale Wind Project |
34.000 |
74 |
1/2/105 |
ElectroRoute Energy Supply Ltd. |
Coollegrean Windfarm Ltd. |
Coollegrean Brosna Co. Kerry |
Large Scale Wind Project |
18.500 |
75 |
1/2/106 |
ElectroRoute Energy Supply Ltd. |
Cumhacht an Tigh Sholais Teoranta |
Rossaveel Windfarm Rossaveel Connemara Co. Galway |
Small Scale Wind Project |
3.000 |
76 |
1/2/107 |
SSE Airtricity Ltd. |
Seahound Wind Developments Ltd. |
Letteragh Co. Clare |
Large Scale Wind Project |
13.400 |
77 |
1/2/108 |
Green Grid Ltd. |
REI Wind Developments Ltd. |
Turraheen Upper Hollyford Co. Tipperary |
Small Scale Wind Project |
0.494 |
78 |
1/2/109 |
ESBIE T/A Electric Ireland Ltd. |
ESB |
Moneypoint Power Station Killimer Co. Clare |
Large Scale Wind Project |
18.000 |
79 |
1/2/112 |
ElectroRoute Energy Supply Ltd. |
Aeolus Windfarms Ltd. |
Bunnyconnellan Windfarm Bunnyconnellan East & Drumsheen Ballina Co. Mayo |
Large Scale Wind Project |
27.600 |
80 |
1/2/113 |
Flogas Enterprise Solutions Ltd. |
Cloghaneleskirt Wind Farm Ltd. |
Cloghaneleskirt Lyrecrumpane Tralee Co. Kerry |
Large Scale Wind Project |
11.500 |
81 |
1/2/114 |
Dunman Energy Supply Ltd. |
Killaveenoge Windfarm Ltd. |
Killaveenoge West Derreenaspeeg Killaveenoge East Curranashingane & Garranes Drinagh Co. Cork |
Large Scale Wind Project |
24.800 |
82 |
1/2/115 |
Templederry Renewable Energy Supply Ltd. |
Kilaclug Hydro Scheme Ltd. |
Kilaclug Macroom Co. Cork |
Hydro Project |
0.300 |
83 |
1/2/118 |
SSE Airtricity Ltd. |
Derrynadivva Windfarm Ltd. |
Raheen Barr Castlebar Co. Mayo |
Large Scale Wind Project |
6.800 |
84 |
1/2/119 |
Shamrock Energy Supply Ltd. |
Meenwaun Windfarm Ltd. |
Meenwaun Banagher Co. Offaly |
Large Scale Wind Project |
9.999 |
85 |
1/2/125 |
ESB |
Kerry Wind Power Ltd. |
Grousemount Windfarm Kilgarvan Co. Kerry |
Large Scale Wind Project |
114.200 |
86 |
1/2/126 |
SSE Airtricity Ltd. |
Mid Clare Renewable Energy DAC |
Cahermurphy Kilmihil Kilrush Co. Clare |
Large Scale Wind Project |
6.000 |
87 |
1/2/127 |
SSE Airtricity Ltd. |
Mauricetown Wind Farm Ltd. |
Mauricetown Windfarm Glenduff Darrery & Coolnanoglash Ballagh Co. Limerick |
Large Scale Wind Project |
13.800 |
88 |
1/2/128 |
Flogas Enterprise Solutions Ltd. |
Meenaward Wind Farm Ltd. |
Sladran & Shandrim Buncrana Lifford Co. Donegal |
Large Scale Wind Project |
6.900 |
89 |
1/2/130 |
ESB |
Oweninny Power Ltd. |
Oweninny Power Windfarm (Phase 1) Oweninny Bellacorrick Crossmolina Co. Mayo |
Large Scale Wind Project |
89.000 |
90 |
1/2/132 |
Flogas Enterprise Solutions Ltd. |
Louis A. McAuley (1976) Ltd. |
Burtonstown Balrath Navan Co. Meath |
Small Scale Wind Project |
0.300 |
91 |
1/2/133 |
Captured Carbon Ltd. |
Ballon Meats |
Raheenkillane Ballon Co. Carlow |
Small Scale Wind Project |
0.499 |
92 |
1/2/134 |
ESB |
Cappawhite Wind Ltd. |
Cappawhite Windfarm Cappawhite Co. Tipperary |
Large Scale Wind Project |
52.000 |
93 |
1/2/135 |
Energia Customer Solutions Ltd. |
Tullynamoyle Windfarm 3 Ltd. |
Tullynamoyle Windfarm 3 Killarga Co. Leitrim |
Large Scale Wind Project |
13.578 |
94 |
1/2/139 |
SSE Airtricity Ltd. |
Leanamore Wind Farm Ltd. |
Leanamore Lislaughtin Ballylongford Co. Kerry |
Large Scale Wind Project |
18.000 |
95 |
1/2/144 |
Statkraft Markets GmbH |
Tierney Farms |
Caherbrack Ballinamult Co. Waterford |
Small Scale Wind Project |
0.150 |
96 |
1/2/145 |
Bord Gáis Energy Ltd. |
Tullynamoyle Wind Farm 2 Ltd. |
Tullynamoyle Windfarm 2 Tullynamoyle Killarga Co. Leitrim |
Large Scale Wind Project |
10.225 |
97 |
1/2/146 |
Snowgold Ltd. |
Booly Windfarm Ltd. |
Booleynagearagh Lissycasey Co. Clare |
Large Scale Wind Project |
36.980 |
98 |
1/2/149 |
Cloghaneleskirt Energy Supply Ltd. |
Dromadda Beg Wind Farm Ltd. |
Dromadda Beg Glantaunyalkeen Cloghboola Lyrecrumpane Listowel Co. Kerry |
Large Scale Wind Project |
9.999 |
99 |
1/2/150 |
ESB |
Castlepook Power Ltd. |
Castlepook Windfarm Ballyhoura Co. Cork |
Large Scale Wind Project |
33.100 |
100 |
1/2/152 |
SSE Airtricity Ltd. |
Grady Joinery Ltd. |
Brackloonagh South Charlestown Co. Mayo |
Small Scale Wind Project |
2.350 |
101 |
1/2/160 |
Abo Wind Supply Ltd. Clogheravaddy Supply Ltd. |
Clogheravaddy Wind Farm Ltd. |
Meenagranoge Meenacahan Inver Co. Donegal |
Large Scale Wind Project |
9.200 |
102 |
1/2/161 |
Bally Wind Supply Ltd. |
Milestone Windfarm Ltd. |
Knockcurraghbola Commons Knockcurraghbola Crownlands Granaira, Shevry, Milestone & Inchivara Co. Tipperary |
Large Scale Wind Project |
13.180 |
103 |
1/2/162 |
Tramlock Ltd. |
PWWP Developments Ltd. |
Magheramore Regganbrack Bekan Cloontooa Caraun, Carrowreagh Ballykinava Cullmore Claremorris Co. Mayo |
Large Scale Wind Project |
40.799 |
104 |
1/2/167 |
SWS Green Energy Ltd. |
Knockawarriga 2 Windfarm Ltd. |
Knockwarriga Co. Limerick |
Large Scale Wind Project |
6.600 |
105 |
1/2/168 |
SWS Green Energy Ltd. |
CCWFL Ltd. |
Slievecallan Co. Clare |
Large Scale Wind Project |
26.875 |
106 |
1/2/169 |
SSE Airtricity Ltd. |
Kiltumper Wind Farm Ltd. |
Kiltumper Kilmihil Co. Clare |
Small Scale Wind Project |
4.600 |
107 |
1/2/170 |
Energia Customer Solutions Ltd. |
Ballybane Windfarms Ltd. |
Glanta Commons Windfarm Extension (Phase 3) Dromourneen, Bantry Co. Cork |
Small Scale Wind Project |
4.450 |
108 |
1/2/180 |
ElectroRoute Energy Supply Ltd. |
Teevurcher Ltd. |
Teevurcher & Agheragh Tierworker Kells Co. Meath |
Large Scale Wind Project |
9.000 |
109 |
1/2/185 |
ElectroRoute Energy Supply Ltd. |
B&R Wind Ltd. |
Boolard Dromina Charleville Co. Cork |
Small Scale Wind Project |
4.449 |
110 |
1/2/186 |
ElectroRoute Energy Supply Ltd. |
B&R Wind Ltd. |
Rathnacally Charleville Co. Cork |
Small Scale Wind Project |
4.449 |
111 |
1/2/187 |
Flogas Enterprise Solutions Ltd. |
Tesco Ireland |
Turvey Avenue Donabate Co. Dublin |
Small Scale Wind Project |
0.499 |
112 |
1/2/188 |
Statkraft Markets GmbH |
Winter Winds Ltd. |
Toberatoreen & Beenanaspuck Windfarm Gortdromasillahy Kilbaha North Co. Kerry |
Large Scale Wind Project |
24.500 |
113 |
1/2/192 |
SSE Airtricity Ltd. |
Carrickallen Wind Ltd. |
Carrickallen Mountainlodge Cootehill Co. Cavan |
Large Scale Wind Project |
20.500 |
114 |
1/2/196 |
Warmhill Ltd. |
Knockalough Wind Farm Ltd. |
Knockalough Finisklin & Laughill Co. Galway |
Large Scale Wind Project |
33.600 |
115 |
1/2/197 |
Plum Energy Supply Ltd. |
WCRE Windfarm Ltd. |
Slieve Callan Co. Clare |
Large Scale Wind Project |
44.515 |
116 |
1/2/198 |
Rio Energy Supply Ltd. |
Clare Winds Ltd. |
Glenmore Boolnamweel Boolynakockaun Furoor Kilmihil Co. Clare |
Large Scale Wind Project |
23.999 |
117 |
1/2/199 |
Stacks Energy Supply Ltd. |
Barna Wind Energy (B.W.E.) Ltd. |
Lackareagh Garanereagh Lissarda Barnadivane & others Co. Cork |
Large Scale Wind Project |
57.600 |
118 |
1/2/200 |
Flogas Enterprise Solutions Ltd. |
Corvin Wind Ltd. |
Mossedge Windfarm Bauville, Keelogs & Clonglash Druminderry Upper & Lower Buncrana Co. Donegal |
Small Scale Wind Project |
0.499 |
119 |
1/2/202 |
Flogas Enterprise Solutions Ltd. |
Corvin Wind Ltd. |
Corvin Windfarm Bauville, Keelogs & Clonglash Buncrana Co. Donegal |
Small Scale Wind Project |
2.100 |
120 |
1/2/203 |
Flogas Enterprise Solutions Ltd. |
Curraghderrig Wind Ltd. |
Curraghderrig Asdee Co. Kerry |
Small Scale Wind Project |
4.500 |
121 |
1/2/204 |
Statkraft Markets GmbH |
Kilpatrick Wind Ltd. |
Kilpatrick Bandon Co. Cork |
Small Scale Wind Project |
0.499 |
122 |
1/2/212 |
Fallback Ltd. |
Inchee Energy Supply Ltd. |
Derrineanig & Derragh Macroom Co. Cork |
Large Scale Wind Project |
42.640 |
123 |
1/2/213 |
ElectroRoute Energy Supply Ltd. |
Ballycumber Wind Farm Ltd. |
Ballycumber Tinahely Co. Wicklow |
Large Scale Wind Project |
17.999 |
124 |
1/2/216 |
ElectroRoute Energy Supply Ltd. |
Blacklough Windfarm Ltd. |
Blacklough Windfarm Tawnamore Culleens Dromore West Co. Sligo |
Large Scale Wind Project |
12.500 |
125 |
1/2/217 |
Captured Carbon Ltd. |
Ballynultagh Wind Farm Ltd. |
Ballynultagh Shillelagh Co. Wicklow |
Small Scale Wind Project |
0.498 |
126 |
1/2/220 |
Flogas Enterprise Solutions Ltd. |
Metro Energy Ltd. |
Kilberehert Windfarm Freemount Charleville Co. Cork |
Small Scale Wind Project |
4.799 |
127 |
1/2/222 |
SSE Airtricity Ltd. |
WED Castle Ltd. |
Tullynamalra Castleblaney Co. Monaghan |
Small Scale Wind Project |
2.350 |
128 |
1/2/239 |
ElectroRoute Energy Supply Ltd. |
Enros Wind Farm Ltd. |
Aught Muff Co. Donegal |
Small Scale Wind Project |
2.300 |
129 |
1/2/240 |
ElectroRoute Energy Supply Ltd. |
Three Trees Wind Project Ltd. |
Three Trees Muff Co. Donegal |
Small Scale Wind Project |
4.250 |
130 |
1/2/241 |
ElectroRoute Energy Supply Ltd. |
Powercon Wind Energy Ltd. |
Cloonkeelaun Co. Sligo |
Small Scale Wind Project |
2.650] |
Annotations
Amendments:
F93
Substituted (19.12.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024), art. 5 and sch. 2.
Editorial Notes:
E66
Previous affecting provision: schedule substituted (25.07.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 1) Order 2024 (S.I. No. 377 of 2024), art. 4 and sch. 2; substituted (19.12.2024) as per F-note above.
E67
Previous affecting provision: schedule substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 14 and sch. 3; substituted (25.07.2024) as per E-note above.
E68
Previous affecting provision: schedule substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(b) and sch. 2; substituted (20.02.2023) as per E-note above. Note apparent typo in art. 3(b) substituting sch. 1, not sch. 4. Note also reference to previous amendment by Order of 2020, art. 3(c) which appears to refer to S.I. No. 500 of 2020, art. 3(a).
E69
Previous affecting provision: schedule substituted (2.11.2020) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2020 (S.I. No. 500 of 2020), art. 3(a) and sch. 1; substituted (16.10.2021) as per F-note above.
E70
Previous affecting provision: schedule substituted (29.09.2019) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2019 (S.I. No. 497 of 2019), art. 3(b), sch. 2; substituted (2.11.2020) as per E-note above.
E71
Previous affecting provision: schedule substituted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(f) and sch. 2; substituted (29.09.2019) as per E-note above.
E72
Previous affecting provision: schedule substituted (13.10.2017) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2017 (S.I. No. 459 of 2017), art. 3(a); substituted (27.09.2018) as per E-note above.
E73
Previous affecting provision: schedule substituted (8.12.2016) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016), art. 3(d); substituted (13.10.2017) as per E-note above.
E74
Previous affecting provision: schedule substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(e); substituted (8.12.2016) as per E-note above.
E75
Previous affecting provision: schedule substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(f); substituted (11.12.2015) as per E-note above.
E76
Previous affecting provision: schedule substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(g); substituted (19.12.2014) as per E-note above.
E77
Previous affecting provision: schedule inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(k); superseded (25.10.2013) as per E-note above.
F94[SCHEDULE 5
In this Schedule—
"AD" means anaerobic digestion;
"anaerobic digestion" means the process by which biomass material is broken down by micro-organisms under anaerobic conditions, and where the resulting biogas is used to generate electricity;
"biomass" means the biodegradable fraction of products, waste and residues from biological origin from agriculture (including vegetal and animal substances), forestry and related industries including fisheries and aquaculture, as well as the biodegradable fraction of industrial and municipal waste;
"co-firing" means the combustion of biomass, up to 30% of the stated electricity generation capacity of the plant in any single year, in one of the existing three peat fired power stations operational under state aid clearance;
"cogeneration" means the simultaneous generation in one process of thermal energy and electrical or mechanical energy, or electrical and mechanical energy;
"HECHP" means high efficiency cogeneration which complies with criteria specified in Annex II to Directive 2012/27/EC of the European Parliament and of the Council of 25 October 20121.
(1) Ref No. |
(2) REFIT Power Purchase Agreement Reference |
(3) Supplier |
(4) Electricity generator |
(5) Generation plant Description |
(6) Energy source of electricity |
(7) Capacity Accepted into REFIT (MW) |
1 |
1/3/1 |
Flogas Enterprise Solutions Ltd. |
Green Generation Ltd. |
Gorteen Lower Gas Generator Gorteen Lower Nurney Co. Kildare |
AD HECHP |
1.060 |
2 |
1/3/2 |
Flogas Enterprise Solutions Ltd. |
BioCore Environmental AD1 Ltd. |
BioCore Environmental AD1 Ltd. Tibohine Castlerea Co. Roscommon |
AD HECHP |
0.499 |
3 |
1/3/4 |
Flogas Enterprise Solutions Ltd. |
Rockbrook A.D. |
Rockbrook Ballyroan Portlaoise Co. Laois |
AD HECHP |
0.499 |
4 |
1/3/5 |
Bord Gáis Energy Ltd. |
McDonnell Farms Biogas Ltd. |
GreenGas AD Plant Dunmoylan Shanagolden Co. Limerick |
AD HECHP |
0.499 |
5 |
1/3/10 |
Killowen Biogas Ltd. |
Ormonde Organics AD |
Killowen Portlaw Co. Waterford |
AD HECHP |
0.500 |
6 |
1/3/11 |
Flogas Enterprise Solutions Ltd. |
Ballyshannon Recycling Ltd. |
Adamstown Co. Wexford |
AD HECHP |
0.100 |
7 |
1/3/17 |
Killowen Biogas Ltd. |
Ormonde Organics AD |
Killowen Portlaw Co. Waterford |
AD HECHP |
0.499 |
8 |
1/3/21 |
SSE Airtricity Ltd. |
Cork Green Energy Ltd. |
Gortnalicka Clondrohid Macroom Co. Cork |
Biomass HECHP |
1.200 |
9 |
1/3/23 |
Edenderry Supply Company Ltd. |
Edenderry Power Ltd. |
Ballykilleen Edenderry Co. Offaly |
Biomass co-firing |
38.400** |
10 |
1/3/27 |
Flogas Enterprise Solutions Ltd. |
Carrons Wind Farm Ltd. |
Dunmoylan Shanagolden Co. Limerick |
AD HECHP |
0.500 |
11 |
1/3/34 |
Killowen Biogas Ltd. |
Eras Eco Ltd. |
Foxhole Youghal Co. Cork |
AD HECHP |
0.498 |
12 |
1/3/45 |
Flogas Enterprise Solutions Ltd. |
Timoleague AgriGen Ltd. |
Barrys Hall Timoleague Co. Cork |
AD HECHP |
0.500 |
** Note exact MWh to receive REFIT in respect of this plant will only be known ex-post.]
Annotations
Amendments:
F94
Substituted (19.12.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024), art. 6 and sch. 3.
Editorial Notes:
E78
Previous affecting provision: schedule substituted (25.07.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 1) Order 2024 (S.I. No. 377 of 2024), art. 5 and sch. 3; substituted (19.12.2024) as per F-note above.
E79
Previous affecting provision: schedule substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 14 and sch. 4; substituted (25.07.2024) as per E-note above.
E80
Previous affecting provision: schedule substituted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 3(c) and sch. 3; substituted (20.2.2023) as per E-note above. Note apparent typo in art. 3(c) substituting sch. 2, not sch. 5. Note also reference to previous amendment by Order of 2020, art. 3(c) which appears to refer to S.I. No. 500 of 2020, art. 3(b).
E81
Previous affecting provision: schedule substituted (2.11.2020) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2020 (S.I. No. 500 of 2020), art. 3(b) and sch. 2; substituted (16.10.2021) as per E-note above.
E82
Previous affecting provision: schedule substituted (29.09.2019) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2019 (S.I. No. 497 of 2019), art. 3(c) and sch. 3; substituted (2.11.2020) as per E-note above.
E83
Previous affecting provision: schedule substituted (27.09.2018) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018), art. 3(e) and sch. 3; substituted (29.09.2019) as per E-note above.
E84
Previous affecting provision: schedule substituted (13.10.2017) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2017 (S.I. No. 459 of 2017), art. 3(b); substituted (27.09.2018) as per E-note above.
E85
Previous affecting provision: schedule substituted (8.12.2016) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016), art. 3(e); substituted (13.10.2017) as per E-note above.
E86
Previous affecting provision: schedule substituted (11.12.2015) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015), art. 3(f); substituted (8.12.2016) as per E-note above.
E87
Previous affecting provision: schedule substituted (19.12.2014) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014), art. 2(g); substituted (11.12.2015) as per E-note above.
E88
Previous affecting provision: schedule substituted (25.10.2013) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013), art. 3(g); substituted (19.12.2014) as per E-note above.
E89
Previous affecting provision: schedule inserted (31.10.2012) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012), art. 2(k); superseded (25.10.2013) as per E-note above.
F95[SCHEDULE 6
In this Schedule—
"biogas" has the meaning given to it in Article 2 of the Renewable Energy Directive;
"biomass" has the meaning given to it in Article 2 of the Renewable Energy Directive;
"high efficiency chp" or "HECHP" means high efficiency cogeneration which complies with criteria specified in Annex II to Directive 2012/27/EC of the European Parliament and of the Council of 25 October 20122;
"hydro" means hydroelectric generation which uses hydraulic turbines but excludes pumped-storage hydro;
"onshore wind project" means an onshore energy project using wind turbine generation which is connected directly to the electricity network and metered independently of any other electricity generating plant at a single metering point;
"solar project" means an onshore energy project using solar thermal or solar photovoltaic which is connected directly to the electricity network and metered independently of any other electricity generating plant at a single metering point.
(1) Ref. No. |
(2) RESS Reference |
(3) Supplier |
(4) Electricity generator |
(5) Energy source of electricity |
(6) Capacity Accepted into RESS (MW) |
1 |
1-0066 |
Statkraft Markets GmbH |
Galetech Energy Developments Cloghan Ltd. |
Wind |
34.00 |
2 |
1-0067 |
Cloncreen Wind Farm Supply DAC |
Cloncreen Wind Farm DAC |
Wind |
75.00 |
3 |
1-0140 |
Bord Gáis Energy Ltd. |
Neoen (formerly BNRGN) Hilltown Ltd. |
Solar |
10.00 |
4 |
1-0142 |
Bord Gáis Energy Ltd. |
Neoen (formerly BNGRN) Hortland Ltd. |
Solar |
14.00 |
5 |
1-0155 |
Tippgo Ltd. |
Bawnmore Windfarm Ltd. |
Solar |
4.00 |
6 |
1-0186 |
Bord Gáis Energy Ltd. |
Neoen (formerly BNRGN) Millvale Ltd. |
Solar |
8.00 |
7 |
1-0205 |
Bord Gáis Energy Ltd. |
Bord Na Móna |
Solar |
83.00 |
8 |
1-0226 |
Bord Gáis Energy Ltd. |
Encavis |
Wind |
16.80 |
9 |
1-0228 |
Rio Energy Supply Ltd. |
Clare Winds Ltd. |
Wind |
8.00 |
10 |
1-0234 |
Statkraft Markets GmbH |
Cregg Wind Farm Ltd. |
Wind |
23.06 |
11 |
1-0254 |
Erova Energy Supply Ltd. |
Clogheravaddy Wind Farm Ltd. |
Wind |
10.80 |
12 |
1-0260 |
Erova Energy Supply Ltd. |
Wind Power Consultants Ltd. |
Wind |
0.50 |
13 |
2-0023 |
Flogas Enterprise Solutions Ltd. |
Blue Pine Solar 03 Ltd. |
Solar |
4.00 |
14 |
2-0024 |
Flogas Enterprise Solutions Ltd. |
Blue Pine Solar 06 Ltd. |
Solar |
6.00 |
15 |
2-0031 |
Bord Gáis Energy Ltd. |
BNRG Kerdiffstown Ltd. |
Solar |
4.00 |
16 |
2-0032 |
Bord Gáis Energy Ltd. |
BNRG Dunmurry Ltd. |
Solar |
12.00 |
17 |
2-0075 |
Flogas Enterprise Solutions Ltd. |
EEPV4 Ltd. |
Solar |
35.00 |
18 |
2-0076 |
Flogas Enterprise Solutions Ltd. |
EEPV5 Ltd. |
Solar |
25.00 |
19 |
2-0078 |
Flogas Enterprise Solutions Ltd. |
EEPV3 Ltd. |
Solar |
4.00 |
20 |
2-0080 |
Flogas Enterprise Solutions Ltd. |
Blue Pine Solar 01 Ltd. |
Solar |
4.00 |
21 |
2-0082 |
Flogas Enterprise Solutions Ltd. |
EEPV10 Ltd. |
Solar |
5.80 |
22 |
2-0083 |
Flogas Enterprise Solutions Ltd. |
EEPV2 Ltd. |
Solar |
4.00 |
23 |
2-0088 |
Flogas Enterprise Solutions Ltd. |
Blue Pine Solar 08 Ltd. |
Solar |
4.00 |
24 |
2-0109 |
ESB |
Harmony Solar Longford Ltd. |
Solar |
56.60 |
25 |
2-0111 |
Bord Gáis Energy Ltd. |
Joriclo Ltd. |
Solar |
80.00 |
26 |
2-0156 |
Bord Gáis Energy Ltd. |
Natkhas Ltd. |
Solar |
95.00 |
27 |
2-0214 |
ESB |
Tullarmore Solar Farm Ltd. |
Solar |
50.00 |
28 |
2-0231 |
Bord Gáis Energy Ltd. |
Clogheravaddy Wind Farm Ltd. |
Wind |
3.60 |
29 |
2-0246 |
Bord Gáis Energy Ltd. |
BNRG Finnis Ltd. |
Solar |
9.40 |
30 |
2-0249 |
Bord Gáis Energy Ltd. |
Tullynamoyle Wind Farm 5 Ltd. |
Wind |
16.35 |
31 |
2-0266 |
Flogas Enterprise Solutions Ltd. |
EEPV6 Ltd. |
Solar |
4.00 |
32 |
2-0267 |
Flogas Enterprise Solutions Ltd. |
EEPV11 Ltd |
Solar |
4.00 |
33 |
2-0268 |
Flogas Enterprise Solutions Ltd. |
EEPV12 Ltd. |
Solar |
4.00 |
34 |
2-0269 |
Flogas Enterprise Solutions Ltd. |
EEPV15 Ltd. |
Solar |
4.00 |
35 |
2-0270 |
Flogas Enterprise Solutions Ltd. |
Blue Pine Solar 02 Ltd. |
Solar |
5.35 |
36 |
2-0277 |
ESB |
Bullstown Solar Ltd. |
Solar |
8.42 |
37 |
2-0285 |
Timahoe North Supply DAC |
Sundew Solar DAC |
Solar |
70.00 |
38 |
2-0287 |
Templederry Renewable Energy Supply Ltd. |
Templederry Renewable Energy Supply Ltd. |
Solar |
4.00 |
39 |
2-0289 |
Bord Gáis Energy Ltd. |
Soleire Renewables SPV Alpha 2 Ltd. |
Solar |
70.00 |
40 |
2-0290 |
Bord Gáis Energy Ltd. |
Soleire Renewables SPV Alpha 2 Ltd. |
Solar |
66.56 |
41 |
3-0086 |
Flogas Enterprise Solutions Ltd. |
EEPV13 Ltd. |
Solar |
4.00 |
42 |
3-0100 |
Flogas Enterprise Solutions Ltd. |
Friarspark Solar Ltd. |
Solar |
2.10 |
43 |
3-0104 |
SSE Airtricity Ltd. |
Green Wind Energy (Wexford) Ltd. |
Wind |
101.00 |
44 |
3-0273 |
Flogas Enterprise Solutions Ltd. |
EEPV8 Ltd. |
Solar |
4.00] |
Annotations
Amendments:
F95
Substituted (19.12.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024), art. 7 and sch. 4.
Editorial Notes:
E90
Previous affecting provision: schedule substituted (25.07.2024) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 1) Order 2024 (S.I. No. 377 of 2024), art. 6 and sch. 4; substituted (19.12.2024) as per F-note above.
E91
Previous affecting provision: schedule substituted (20.02.2023) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023), art. 16 and sch. 5; substituted (25.07.2024) as per E-note above.
E92
Previous affecting provision: schedule inserted (16.10.2021) by Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021), art. 10 and sch. 4; substituted (20.02.2023) as per E-note above.
S.I. No. 217 of 2002
ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) ORDER 2002
REVISED
Updated to 1 August 2025
About this Revised Statutory Instrument
This Revised Statutory Instrument presents the text of the instrument as it has been amended, and preserves the format in which it was made.
Annotations
This Revised Statutory Instrument is annotated and includes textual and non-textual amendments and previous affecting provisions.
An explanation of how to read annotations is available at
www.lawreform.ie/annotations.
Material not updated in this revision
Where other legislation is amended by this instrument, those amendments may have been superseded by other amendments in other legislation, or the amended legislation may have been repealed or revoked. This information is not represented in this revision but will be reflected in a revision of the amended legislation if one is available.
Where legislation or a fragment of legislation is referred to in annotations, changes to this legislation or fragment may not be reflected in this revision but will be reflected in a revision of the legislation referred to if one is available.
A list of legislative changes to any Act, and to statutory instruments from 1972, may be found linked from the page of the Act or statutory instrument at
www.irishstatutebook.ie.
Acts which affect or previously affected this revision
None
All Acts up to and including Statute Law Revision Act 2025 (10/2025), enacted 23 July 2025, were considered in the preparation of this revision.
Statutory instruments which affect or previously affected this revision
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2024 (S.I. No. 756 of 2024)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 1) Order 2024 (S.I. No. 377 of 2024)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2023 (S.I. No. 119 of 2023)
• European Union (Renewable Energy) Regulations (2) 2022 (S.I. No. 350 of 2022)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2021 (S.I. No. 532 of 2021)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2020 (S.I. No. 500 of 2020)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2020 (S.I. No. 56 of 2020)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2019 (S.I. No. 497 of 2019)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2017 (S.I. No. 459 of 2017)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2016 (S.I. No. 600 of 2016)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2015 (S.I. No. 556 of 2015)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2014 (S.I. No. 603 of 2014)
• European Union (Renewable Energy) Regulations 2014 (S.I. No. 483 of 2014)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2013 (S.I. No. 421 of 2013)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2012 (S.I. No. 438 of 2012)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2011 (S.I. No. 513 of 2011)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2010 (S.I. No. 532 of 2010)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2009 (S.I. No. 444 of 2009)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2008 (S.I. No. 284 of 2008)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2007 (S.I. No. 583 of 2007)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2007 (S.I. No. 582 of 2007)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) (No. 2) Order 2005 (S.I. No. 511 of 2005)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2005 (S.I. No. 380 of 2005)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2004 (S.I. No. 174 of 2004)
• Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2002 (S.I. No. 614 of 2002)
All statutory instruments up to and including Air Pollution Act 1987 (Solid Fuels, Moisture Content) (Amendment) Regulations 2025 (S.I. No. 389 of 2025), made 1 August 2025, were considered in the preparation of this revision.