Waste Management Act 1996

F106[Waste prevention programmes

27B

27B. (1) The Agency shall establish waste prevention programmes setting out at least the waste prevention measures as laid down in Section 27A(1) in accordance with Section 21A and with Article 1 of the Waste Directive.

Such programmes shall be integrated either into the waste management plans required under F107[section 22] or into other environmental policy programmes, as appropriate, or shall function as separate programmes. If any such programme is integrated into the waste management plan or into those other programmes, the waste prevention objectives and measures shall be clearly identified.

(2) When establishing such programmes, the Agency shall, where relevant, describe the contribution of instruments and measures listed in the Sixth Schedule to waste prevention and shall evaluate the usefulness of the examples of measures indicated the First Schedule or other appropriate measures. The programmes shall also describe existing waste prevention measures and their contribution to waste prevention.

(3) The aim of such objectives and measures shall be to break the link between economic growth and the environmental impacts associated with the generation of waste.

(4) The Agency shall adopt specific food waste prevention programmes within their waste prevention programmes.

(5) The Agency shall from time to time as it thinks appropriate, and at least once in each period of 6 years after the date of making of a waste prevention programme, evaluate the plan and make such revisions to it, in accordance with Article 9 of the Waste Directive and Regulation 31 of the Regulations of 2011, as it thinks fit and references in Part II and this Part to such a plan shall, unless the context otherwise requires, be construed as including references to such a plan as so revised.

(6) Upon the establishment of a waste prevention programme or programmes or of any revisions thereto, the Agency shall—

(a) cause to be published in at least one national newspaper a notice of that fact and of the means by which a copy of the plan, as made or revised, may be obtained by members of the public at a cost not exceeding the reasonable cost of making a copy, and

(b) furnish a copy of the plan, as made or revised, to the Minister and each local authority, and any other public authority which in the opinion of the Agency has an interest in the programme or programmes.

(7) In this section, "revise", in relation to a waste prevention programme, includes a review of the programme.]

Annotations:

Amendments:

F106

Inserted (27.08.2020) by European Union (Waste Directive) Regulations 2020 (S.I. No. 323 of 2020), reg. 11.

F107

Substituted (1.07.2023) by Circular Economy and Miscellaneous Provisions Act 2022 (26/2022), s. 25, S.I. No. 344 of 2023, art. 4(f).